X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164051615000

Well Details

Well ID: 0164051615000
Loading map...
Location: 00/15-16-016-05W4/0
Location Alias: 00/15-16-16-05 W4M
Location Alias 2: 00/15-16-016-05 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 05
Section: 16
County/Municipality: Cypress County
Well Name: CVE SUFFIELD 15-16-16-5
Operator Name: Ipc Canada Ltd.
License Number: 0071107
License Date: 1978-08-03
License Status: Issued
Spud Date: 1978-09-07
Final Drill Date: 1978-09-08
Well Total Depth: 459.00 m
Surface Hole Latitude: 50.350539
Surface Hole Longitude: -110.633761

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-08-03 Obtained License
1978-09-08 Finished Drilling
1978-09-09 Production Casing Operation Performed
1978-09-09 Well Mode changed to Drilled and Cased
1978-11-07 Perforation Treatment Performed - Jet Perforation
1978-11-13 Perforation Treatment Performed - Fractured
1978-11-20 Perforation Treatment Performed - Jet Perforation
1978-11-28 Perforation Treatment Performed - Fractured
1980-02-26 Well Began Production
1980-02-26 Well Fluid changed to Gas
1980-02-26 Well Mode changed to Flowing
1982-03-22 Well Fluid changed to Gas
1982-03-22 Well Mode changed to Flowing
1997-10-01 Well Fluid changed to Gas
1997-10-01 Well Mode changed to Flowing
2004-05-18 Well Log Performed
2004-05-19 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-11-07 Perforation 375.40 378.00 10
1978-11-07 Perforation 405.50 406.20 3
1978-11-07 Perforation 407.00 407.70 3
1978-11-13 Fracture 375.40 407.70 0
1978-11-20 Perforation 278.50 279.30 3
1978-11-20 Perforation 313.70 315.40 3
1978-11-20 Perforation 316.00 317.50 3
1978-11-20 Perforation 319.50 320.80 3
1978-11-20 Perforation 322.60 323.60 3
1978-11-20 Perforation 330.00 330.40 3
1978-11-20 Perforation 331.00 332.00 3
1978-11-28 Fracture 278.50 332.00 0
2004-05-19 Fracture 405.50 407.70 0
2004-05-19 Fracture 375.40 378.00 0
2004-05-19 Fracture 330.00 332.00 0
2004-05-19 Fracture 313.70 323.60 0
2004-05-19 Fracture 278.50 279.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 2571 0.0 0.0 0.0
1981 3915 0.0 0.0 0.0
1982 6299 0.0 0.0 0.0
1983 8620 0.0 0.0 0.0
1984 8780 0.0 0.0 0.0
1985 8750 0.0 0.0 0.0
1986 8759 0.0 0.0 0.0
1987 8750 0.0 0.0 0.0
1988 8778 0.0 0.0 0.0
1989 8759 0.0 0.0 0.0
1990 8711 0.0 0.0 0.0
1991 8759 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8634 0.0 0.0 0.0
2016 8389 0.0 0.0 0.0
2017 8713 0.0 0.0 0.0
2018 8620 0.0 0.0 0.0
2019 8739 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References