X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164051511002

Well Details

Well ID: 0164051511002
Loading map...
Location: 00/11-15-016-05W4/2
Location Alias: 00/11-15-16-05 W4M
Location Alias 2: 00/11-15-016-05 W4/02
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 05
Section: 15
County/Municipality: Cypress County
Well Name: EXORO ENERGY SUFFIELD 11-15-16-5
Operator Name: Gear Energy Ltd.
License Number: 0053950
License Date: 1975-06-19
License Status: Suspension
Spud Date: 1975-07-01
Final Drill Date: 1975-07-04
Well Total Depth: 665.10 m
Surface Hole Latitude: 50.349726
Surface Hole Longitude: -110.612284

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-06-19 Obtained License
1975-07-04 Finished Drilling
1975-07-05 Production Casing Operation Performed
1975-08-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-08-21 Perforation Treatment Performed - Jet Perforation
1975-10-02 Perforation Treatment Performed - Selective Bullet Perforations
1975-10-22 Perforation Treatment Performed - Fractured
1975-10-30 Well Mode changed to Drilled and Cased
1976-07-24 Well Began Production
1976-07-24 Well Fluid changed to Gas
1976-07-24 Well Mode changed to Flowing
1977-09-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-09-09 Well Fluid changed to Gas
1977-09-09 Well Mode changed to Flowing
1979-05-22 Perforation Treatment Performed - Jet Perforation
1979-05-25 Perforation Treatment Performed - Fractured
2016-06-01 Well Fluid changed to Gas
2016-06-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-08-21 Perforation 628.50 629.70 13
1975-10-02 Selective Bullet Perforations 244.80 249.00 0
1975-10-02 Selective Bullet Perforations 249.90 250.90 0
1975-10-02 Selective Bullet Perforations 251.80 252.70 0
1975-10-02 Selective Bullet Perforations 253.60 254.50 0
1975-10-02 Selective Bullet Perforations 256.60 258.50 0
1975-10-02 Selective Bullet Perforations 259.40 264.00 0
1975-10-02 Selective Bullet Perforations 265.80 276.80 0
1975-10-02 Selective Bullet Perforations 277.40 278.00 0
1975-10-02 Selective Bullet Perforations 306.90 307.80 0
1975-10-02 Selective Bullet Perforations 310.00 311.20 0
1975-08-21 Packing Device Capped w/Cement 615.70 623.30 0
1975-10-02 Selective Bullet Perforations 311.80 312.40 0
1975-10-02 Selective Bullet Perforations 314.60 321.60 0
1975-10-02 Selective Bullet Perforations 322.80 323.70 0
1975-10-02 Selective Bullet Perforations 326.40 335.30 0
1975-10-02 Selective Bullet Perforations 336.80 337.40 0
1975-10-02 Selective Bullet Perforations 342.30 343.20 0
1975-10-02 Selective Bullet Perforations 368.80 369.40 0
1975-10-02 Selective Bullet Perforations 379.20 379.80 0
1975-10-02 Selective Bullet Perforations 387.40 388.00 0
1975-10-02 Selective Bullet Perforations 408.40 409.00 0
1975-10-02 Selective Bullet Perforations 191.70 192.30 0
1975-10-02 Selective Bullet Perforations 430.40 431.00 0
1975-10-02 Selective Bullet Perforations 439.80 440.40 0
1975-10-02 Selective Bullet Perforations 475.20 475.80 0
1975-10-02 Selective Bullet Perforations 476.40 479.10 0
1975-10-02 Selective Bullet Perforations 479.80 480.70 0
1975-10-02 Selective Bullet Perforations 486.50 487.10 0
1975-10-02 Selective Bullet Perforations 490.40 491.00 0
1975-10-22 Fracture 191.70 491.00 0
1977-09-09 Packing Device Capped w/Cement 457.20 464.80 0
1979-05-22 Perforation 310.30 312.70 10
1975-10-02 Selective Bullet Perforations 201.50 202.40 0
1979-05-22 Perforation 340.10 342.00 7
1979-05-25 Fracture 306.90 343.20 0
1975-10-02 Selective Bullet Perforations 215.80 216.70 0
1975-10-02 Selective Bullet Perforations 219.80 220.40 0
1975-10-02 Selective Bullet Perforations 223.40 224.30 0
1975-10-02 Selective Bullet Perforations 225.20 240.50 0
1975-10-02 Selective Bullet Perforations 241.10 243.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2033 0.0 0.0 0.0
1977 5748 0.0 0.0 0.0
1978 6871 0.0 0.0 0.0
1979 6487 0.0 0.0 0.0
1980 8288 0.0 0.0 0.0
1981 8734 0.0 0.0 0.0
1982 8600 0.0 0.0 0.0
1983 5578 0.0 0.0 0.0
1984 5388 0.0 0.0 0.0
1985 7199 0.0 0.0 0.0
1986 6114 0.0 0.0 0.0
1987 6738 0.0 0.0 0.0
1988 3213 0.0 0.0 0.0
1989 8388 0.0 0.0 0.0
1990 8753 0.0 0.0 0.0
1991 6844 0.0 0.0 0.0
1992 8778 0.0 0.0 0.0
1993 8588 0.0 0.0 0.0
1994 8757 0.0 0.0 0.0
1995 8750 0.0 0.0 0.0
1996 8776 0.0 0.0 0.0
1997 8751 0.0 0.0 0.0
1998 8737 0.0 0.0 0.0
1999 8720 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8740 0.0 0.0 0.0
2004 8268 0.0 0.0 0.0
2005 8195 0.0 0.0 0.0
2006 8644 0.0 0.0 0.0
2007 8613 0.0 0.0 0.0
2008 8581 0.0 0.0 0.0
2009 8689 0.0 0.0 0.0
2010 8686 0.0 0.0 0.0
2011 8600 0.0 0.0 0.0
2012 8614 0.0 0.0 0.0
2013 8615 0.0 0.0 0.0
2014 8548 0.0 0.0 0.0
2015 4649 0.0 0.0 0.0

For data sources see[5]

References