X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164051406000

Well Details

Well ID: 0164051406000
Loading map...
Location: 00/06-14-016-05W4/0
Location Alias: 00/06-14-16-05 W4M
Location Alias 2: 00/06-14-016-05 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 05
Section: 14
County/Municipality: Cypress County
Well Name: EXORO ENERGY MEDHAT 6-14-16-5
Operator Name: Gear Energy Ltd.
License Number: 0057247
License Date: 1976-02-24
License Status: Suspension
Spud Date: 1976-03-15
Final Drill Date: 1976-03-20
Well Total Depth: 514.20 m
Surface Hole Latitude: 50.345874
Surface Hole Longitude: -110.589433

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-02-24 Obtained License
1976-03-20 Finished Drilling
1976-03-20 Well Mode changed to Drilled and Cased
1976-03-21 Production Casing Operation Performed
1976-04-30 Perforation Treatment Performed - Jet Perforation
1976-05-01 Perforation Treatment Performed - Fractured
1976-05-06 Perforation Treatment Performed - Fractured
1976-05-06 Perforation Treatment Performed - Selective Jet Perforations
1976-07-25 Well Began Production
1976-07-25 Well Fluid changed to Gas
1976-07-25 Well Mode changed to Flowing
1979-10-25 Perforation Treatment Performed - Fractured
1979-10-25 Perforation Treatment Performed - Jet Perforation
2016-06-01 Well Fluid changed to Gas
2016-06-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-04-30 Perforation 428.50 428.90 7
1976-05-06 Selective Jet Perforations 338.90 339.50 0
1976-05-06 Selective Jet Perforations 342.30 347.50 0
1976-05-06 Selective Jet Perforations 349.00 353.00 0
1976-05-06 Selective Jet Perforations 354.80 359.40 0
1976-05-06 Fracture 275.50 359.40 0
1979-10-25 Perforation 429.40 430.90 6
1979-10-25 Fracture 428.50 458.10 0
1976-04-30 Perforation 429.50 431.00 7
1976-04-30 Perforation 453.50 454.50 7
1976-04-30 Perforation 457.50 458.10 7
1976-05-01 Fracture 428.50 458.10 0
1976-05-06 Selective Jet Perforations 275.50 311.20 0
1976-05-06 Selective Jet Perforations 311.50 324.60 0
1976-05-06 Selective Jet Perforations 326.40 336.20 0
1976-05-06 Selective Jet Perforations 337.10 337.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2009 0.0 0.0 0.0
1977 7295 0.0 0.0 0.0
1978 7325 0.0 0.0 0.0
1979 4605 0.0 0.0 0.0
1980 5961 0.0 0.0 0.0
1981 8734 0.0 0.0 0.0
1982 7983 0.0 0.0 0.0
1983 4752 0.0 0.0 0.0
1984 5728 0.0 0.0 0.0
1985 7030 0.0 0.0 0.0
1986 6329 0.0 0.0 0.0
1987 6693 0.0 0.0 0.0
1988 3167 0.0 0.0 0.0
1989 8125 0.0 0.0 0.0
1990 8563 0.0 0.0 0.0
1991 7887 0.0 0.0 0.0
1992 8778 0.0 0.0 0.0
1993 8588 0.0 0.0 0.0
1994 8757 0.0 0.0 0.0
1995 8750 0.0 0.0 0.0
1996 8776 0.0 0.0 0.0
1997 8751 0.0 0.0 0.0
1998 8737 0.0 0.0 0.0
1999 8720 0.0 0.0 0.0
2000 8780 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8740 0.0 0.0 0.0
2004 8268 0.0 0.0 0.0
2005 8195 0.0 0.0 0.0
2006 8650 0.0 0.0 0.0
2007 8596 0.0 0.0 0.0
2008 8582 0.0 0.0 0.0
2009 8689 0.0 0.0 0.0
2010 8686 0.0 0.0 0.0
2011 8600 0.0 0.0 0.0
2012 8614 0.0 0.0 0.0
2013 8615 0.0 0.0 0.0
2014 8548 0.0 0.0 0.0
2015 4801 0.0 0.0 0.0

For data sources see[5]

References