X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164042803000

Well Details

Well ID: 0164042803000
Loading map...
Location: 00/03-28-016-04W4/0
Location Alias: 00/03-28-16-04 W4M
Location Alias 2: 00/03-28-016-04 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 04
Section: 28
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 3-28-16-4
Operator Name: Canlin Energy Corporation
License Number: 0188160
License Date: 1996-05-30
License Status: Issued
Spud Date: 1996-06-26
Final Drill Date: 1996-06-26
Well Total Depth: 512.00 m
Surface Hole Latitude: 50.371621
Surface Hole Longitude: -110.501660

For data sources see[1][2]

Well History

Date Event
1996-05-30 Obtained License
1996-06-26 Finished Drilling
1996-06-26 Surface Casing Operation Performed
1996-06-26 Well Mode changed to Drilled and Cased
1996-06-27 Production Casing Operation Performed
1996-06-27 Rig Released
1996-07-07 Well Log Performed
1996-07-13 Perforation Treatment Performed - Jet Perforation
1996-07-17 Perforation Treatment Performed - Fractured
1996-07-20 Perforation Treatment Performed - Jet Perforation
1996-07-21 Perforation Treatment Performed - Fractured
1996-08-12 Well Began Production
1996-08-12 Well Fluid changed to Gas
1996-08-12 Well Mode changed to Flowing
1996-10-29 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-07-13 Perforation 445.00 446.00 7
1996-07-20 Perforation 372.50 373.00 7
1996-07-20 Perforation 381.00 381.50 7
1996-07-20 Perforation 383.00 383.50 7
1996-07-20 Perforation 385.00 385.50 7
1996-07-20 Perforation 387.00 387.50 7
1996-07-20 Perforation 389.00 389.50 7
1996-07-20 Perforation 391.00 391.50 7
1996-07-20 Perforation 396.50 397.00 7
1996-07-20 Perforation 399.00 399.50 7
1996-07-20 Perforation 406.00 406.50 7
1996-07-13 Perforation 447.00 448.00 7
1996-07-21 Fracture 357.00 406.50 7
1996-07-13 Perforation 473.50 474.50 7
1996-07-13 Perforation 476.50 477.50 7
1996-07-17 Fracture 445.00 477.50 0
1996-07-20 Perforation 357.00 357.50 7
1996-07-20 Perforation 362.00 362.50 7
1996-07-20 Perforation 365.50 366.00 7
1996-07-20 Perforation 369.00 369.50 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 3370 0.0 0.0 0.0
1997 8748 0.0 0.0 0.0
1998 8689 0.0 0.0 0.0
1999 8757 0.0 0.0 0.0
2000 8781 0.0 0.0 0.0
2001 8241 0.0 0.0 0.0
2002 8224 0.0 0.0 0.0
2003 8351 0.0 0.0 0.0
2004 8352 0.0 0.0 0.0
2005 8443 0.0 0.0 0.0
2006 8744 0.0 0.0 0.0
2007 8561 0.0 0.0 0.0
2008 8633 0.0 0.0 0.0
2009 8426 0.0 0.0 0.0
2010 7838 0.0 0.0 0.0
2011 8330 0.0 0.0 0.0
2012 7811 0.0 0.0 0.0
2013 8739 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8099 0.0 0.0 0.0
2019 8508 0.0 0.0 0.0
2020 2057 0.0 0.0 0.0

For data sources see[5]

References