X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164030906002

Well Details

Well ID: 0164030906002
Loading map...
Location: 00/06-09-016-03W4/2
Location Alias: 00/06-09-16-03 W4M
Location Alias 2: 00/06-09-016-03 W4/02
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 03
Section: 09
County/Municipality: Cypress County
Well Name: GASCAN MEDHAT 6-9-16-3
Operator Name: TAQA North Ltd.
License Number: 0069893
License Date: 1978-06-02
License Status: Issued
Spud Date: 1978-07-09
Final Drill Date: 1978-07-11
Well Total Depth: 824.50 m
Surface Hole Latitude: 50.331325
Surface Hole Longitude: -110.364899

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-06-02 Obtained License
1978-07-11 Finished Drilling
1978-07-11 Production Casing Operation Performed
1978-07-11 Well Mode changed to Drilled and Cased
1978-07-14 Perforation Treatment Performed - Bullet Perforation
1978-07-14 Perforation Treatment Performed - Selective Bullet Perforations
1978-10-19 Perforation Treatment Performed - Selective Bullet Perforations
1978-11-02 Perforation Treatment Performed - Fractured
1979-10-08 Perforation Treatment Performed - Selective Bullet Perforations
1979-12-04 Well Began Production
1979-12-04 Well Fluid changed to Gas
1979-12-04 Well Mode changed to Flowing
1980-11-07 Perforation Treatment Performed - Fractured
1987-01-06 Well Structure changed to Commingled
1990-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-10-05 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-07-14 Selective Bullet Perforations 704.50 705.50 0
1978-07-14 Selective Bullet Perforations 734.00 735.00 0
1978-07-14 Selective Bullet Perforations 736.00 737.50 0
1978-07-14 Selective Bullet Perforations 738.50 739.50 0
1978-07-14 Selective Bullet Perforations 742.30 744.30 0
1978-07-14 Selective Bullet Perforations 745.30 746.00 0
1978-07-14 Selective Bullet Perforations 748.00 749.00 0
1978-07-14 Selective Bullet Perforations 750.00 751.00 0
1978-07-14 Selective Bullet Perforations 752.00 753.00 0
1978-07-14 Selective Bullet Perforations 754.00 755.00 0
1978-07-14 Selective Bullet Perforations 755.50 756.00 0
1978-07-14 Selective Bullet Perforations 708.50 710.50 0
1978-07-14 Selective Bullet Perforations 759.00 759.00 0
1978-07-14 Bullet Perforation 756.50 758.50 10
1978-10-19 Selective Bullet Perforations 516.00 516.50 0
1978-10-19 Selective Bullet Perforations 517.00 517.50 0
1978-10-19 Selective Bullet Perforations 518.00 518.50 0
1978-10-19 Selective Bullet Perforations 519.00 519.50 0
1978-10-19 Selective Bullet Perforations 520.00 520.50 0
1978-10-19 Selective Bullet Perforations 521.00 522.00 0
1978-10-19 Selective Bullet Perforations 523.50 524.50 0
1978-10-19 Selective Bullet Perforations 526.00 527.50 0
1978-07-14 Selective Bullet Perforations 712.00 713.00 0
1978-10-19 Selective Bullet Perforations 528.50 529.50 0
1978-10-19 Selective Bullet Perforations 532.00 534.00 0
1978-10-19 Selective Bullet Perforations 535.50 537.50 0
1978-10-19 Selective Bullet Perforations 543.50 543.50 0
1978-11-02 Fracture 516.00 543.50 0
1979-10-08 Selective Bullet Perforations 499.00 500.00 0
1979-10-08 Selective Bullet Perforations 501.00 502.00 0
1979-10-08 Selective Bullet Perforations 503.00 504.00 0
1979-10-08 Selective Bullet Perforations 497.50 498.50 0
1979-10-08 Selective Bullet Perforations 499.50 500.50 0
1978-07-14 Selective Bullet Perforations 715.00 717.00 0
1979-10-08 Selective Bullet Perforations 501.50 502.50 0
1979-10-08 Selective Bullet Perforations 503.50 504.50 0
1979-10-08 Selective Bullet Perforations 505.50 506.50 0
1979-10-08 Selective Bullet Perforations 507.50 508.50 0
1979-10-08 Selective Bullet Perforations 509.00 510.00 0
1979-10-08 Selective Bullet Perforations 512.00 513.00 0
1980-11-07 Fracture 497.50 513.00 0
1990-10-05 Packing Device Capped w/Cement 675.00 683.00 0
1978-07-14 Selective Bullet Perforations 718.00 720.50 0
1978-07-14 Selective Bullet Perforations 721.50 722.50 0
1978-07-14 Selective Bullet Perforations 724.50 726.50 0
1978-07-14 Selective Bullet Perforations 727.50 729.00 0
1978-07-14 Selective Bullet Perforations 731.00 732.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 662 0.0 0.0 0.0
1980 6965 0.0 0.0 0.0
1981 7271 0.0 0.0 0.0
1982 7346 0.0 0.0 0.0
1983 5375 0.0 0.0 0.0
1984 6681 0.0 0.0 0.0
1985 7156 0.0 0.0 0.0
1986 6021 0.0 0.0 0.0

For data sources see[5]

References