X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164011916000

Well Details

Well ID: 0164011916000
Loading map...
Location: 00/16-19-016-01W4/0
Location Alias: 00/16-19-16-01 W4M
Location Alias 2: 00/16-19-016-01 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 01
Section: 19
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 16-19-16-1
Operator Name: Canlin Energy Corporation
License Number: 0085117
License Date: 1980-08-21
License Status: Issued
Spud Date: 1980-09-01
Final Drill Date: 1980-09-02
Well Total Depth: 606.00 m
Surface Hole Latitude: 50.367648
Surface Hole Longitude: -110.120182

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-08-21 Obtained License
1980-09-02 Finished Drilling
1980-09-02 Production Casing Operation Performed
1980-09-02 Well Mode changed to Drilled and Cased
1980-10-03 Perforation Treatment Performed - Jet Perforation
1980-10-31 Perforation Treatment Performed - Fractured
1980-11-02 Well Began Production
1980-11-02 Well Fluid changed to Gas
1980-11-02 Well Mode changed to Flowing
2000-08-03 Perforation Treatment Performed - Jet Perforation
2000-08-21 Perforation Treatment Performed - Fractured
2000-09-21 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-10-03 Perforation 555.00 559.00 5
2000-08-03 Perforation 462.00 464.00 7
2000-08-21 Fracture 585.00 588.00 0
2000-08-21 Fracture 569.00 571.00 0
2000-08-21 Fracture 555.00 559.00 0
2000-08-21 Fracture 517.00 519.00 0
2000-08-21 Fracture 499.00 503.00 0
2000-09-21 Fracture 483.00 486.00 0
2000-09-21 Fracture 474.00 475.00 0
2000-09-21 Fracture 462.00 464.00 0
1980-10-31 Fracture 555.00 559.00 0
2000-08-03 Perforation 585.00 588.00 7
2000-08-03 Perforation 569.00 571.00 7
2000-08-03 Perforation 555.00 559.00 7
2000-08-03 Perforation 517.00 519.00 7
2000-08-03 Perforation 499.00 503.00 7
2000-08-03 Perforation 483.00 486.00 7
2000-08-03 Perforation 474.00 475.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1423 0.0 0.0 0.0
1981 3989 0.0 0.0 0.0
1982 6404 0.0 0.0 0.0
1983 1549 0.0 0.0 0.0
1984 8604 0.0 0.0 0.0
1985 8570 0.0 0.0 0.0
1986 8714 0.0 0.0 0.0
1987 8405 0.0 0.0 0.0
1988 8719 0.0 0.0 0.0
1989 8322 0.0 0.0 0.0
1990 8441 0.0 0.0 0.0
1991 8114 0.0 0.0 0.0
1992 7833 0.0 0.0 0.0
1993 8597 0.0 0.0 0.0
1994 8523 0.0 0.0 0.0
1995 8596 0.0 0.0 0.0
1996 8742 0.0 0.0 0.0
1997 8401 0.0 0.0 0.0
1998 8644 0.0 0.0 0.0
1999 8708 0.0 0.0 0.0
2000 7925 0.0 0.0 0.0
2001 8724 0.0 0.0 0.0
2002 8700 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8759 0.0 0.0 0.0
2005 8600 0.0 0.0 0.0
2006 8255 0.0 0.0 0.0
2007 8653 0.0 0.0 0.0
2008 8573 0.0 0.0 0.0
2009 8427 0.0 0.0 0.0
2010 8169 0.0 0.0 0.0
2011 8695 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8231 0.0 0.0 0.0
2018 8123 0.0 0.0 0.0
2019 8375 0.0 0.0 0.0
2020 1725 0.0 0.0 0.0

For data sources see[5]

References