X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154280413000

Well Details

Well ID: 0154280413000
Loading map...
Location: 00/13-04-015-28W4/0
Location Alias: 00/13-04-15-28 W4M
Location Alias 2: 00/13-04-015-28 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 28
Section: 04
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: TEXACO BAYSEL PINE COULEE A-13-4
Operator Name: Imperial Oil Resources Limited
License Number: 0008943
License Date: 1954-12-31
License Status: RecCertified
Spud Date: 1955-01-11
Final Drill Date: 1955-06-17
Well Total Depth: 3523.50 m
Surface Hole Latitude: 50.234839
Surface Hole Longitude: -113.801266

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-12-31 Obtained License
1955-03-13 Drill Stem Test Performed
1955-04-13 Drill Stem Test Performed
1955-04-16 Drill Stem Test Performed
1955-04-28 Drill Stem Test Performed
1955-05-22 Drill Stem Test Performed
1955-05-27 Drill Stem Test Performed
1955-05-28 Drill Stem Test Performed
1955-06-12 Drill Stem Test Performed
1955-06-17 Finished Drilling
1955-06-18 Drill Stem Test Performed
1955-06-23 Production Casing Operation Performed
1955-06-26 Perforation Treatment Performed - Jet Perforation
1955-06-28 Perforation Treatment Performed - Acid Wash - No Pressure
1955-07-06 Perforation Treatment Performed - Acid Wash - No Pressure
1955-09-01 Well Mode changed to Drilled and Cased
1962-05-15 Well Began Production
1962-05-15 Well Fluid changed to Gas
1962-05-15 Well Mode changed to Flowing
1963-12-30 Well Fluid changed to Gas
1963-12-30 Well Mode changed to Suspended
1965-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1965-02-22 Well Abandoned
1965-02-22 Well Fluid changed to Gas
1965-02-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-06-26 Perforation 2676.80 2685.90 13
1955-06-28 Acid Wash 2676.80 2685.90 0
1955-07-06 Acid Wash 2676.80 2685.90 0
1965-02-11 Packing Device Capped w/Cement 2641.40 2641.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0

For data sources see[5]

References