X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154200203002

Well Details

Well ID: 0154200203002
Loading map...
Location: 00/03-02-015-20W4/2
Location Alias: 00/03-02-15-20 W4M
Location Alias 2: 00/03-02-015-20 W4/02
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 20
Section: 02
County/Municipality: Vulcan County
Well Name: CNRL LBOW 3-2-15-20
Operator Name: Canadian Natural Resources Limited
License Number: 0223719
License Date: 1999-06-17
License Status: Issued
Spud Date: 1999-06-22
Final Drill Date: 1999-06-27
Well Total Depth: 1268.00 m
Surface Hole Latitude: 50.223225
Surface Hole Longitude: -112.651531

For data sources see[1][2]

Well History

Date Event
1999-06-17 Obtained License
1999-06-23 Surface Casing Operation Performed
1999-06-24 Direction Drilling Operation Performed - Deviate
1999-06-27 Finished Drilling
1999-06-27 Well Log Performed
1999-06-27 Well Mode changed to Drilled and Cased
1999-06-28 Drill Stem Test Performed
1999-06-28 Production Casing Operation Performed
1999-06-29 Rig Released
1999-06-30 Well Log Performed
1999-07-05 Perforation Treatment Performed - Jet Perforation
1999-07-05 Well Log Performed
1999-07-05 Well Mode changed to Drilled and Cased
1999-07-07 Perforation Treatment Performed - Jet Perforation
1999-07-07 Well Log Performed
1999-08-25 Well Log Performed
1999-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-27 Plug Back Performed
1999-08-28 Perforation Treatment Performed - Jet Perforation
1999-08-28 Well Log Performed
1999-09-02 Well Began Production
1999-09-02 Well Fluid changed to Crude Oil
1999-09-02 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-06-24 807.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-07-05 Perforation 1230.50 1232.00 20
1999-07-05 Perforation 1233.00 1234.00 20
1999-07-05 Perforation 1209.50 1211.00 20
1999-07-07 Perforation 1211.00 1212.50 20
1999-08-27 Packing Device Capped w/Cement 1217.00 1225.00 0
1999-08-28 Perforation 1212.50 1215.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 2899 0.0 0.0 0.0
2000 1094 0.0 0.0 0.0
2001 3539 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8700 0.0 0.0 0.0
2004 8781 0.0 0.0 0.0
2005 8731 0.0 0.0 0.0
2006 8245 0.0 0.0 0.0
2007 8368 0.0 0.0 0.0
2008 8074 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 7996 0.0 0.0 0.0
2011 8565 0.0 0.0 0.0
2012 8729 0.0 0.0 0.0
2013 7703 0.0 0.0 0.0
2014 8539 0.0 0.0 0.0
2015 7892 0.0 0.0 0.0
2016 8773 0.0 0.0 0.0
2017 8543 0.0 0.0 0.0
2018 6350 0.0 0.0 0.0
2019 4440 0.0 0.0 0.0
2020 1872 0.0 0.0 0.0

For data sources see[6]

References