X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154200108004

Well Details

Well ID: 0154200108004
Loading map...
Location: 00/08-01-015-20W4/4
Location Alias: 00/08-01-15-20 W4M
Location Alias 2: 00/08-01-015-20 W4/04
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 20
Section: 01
County/Municipality: Vulcan County
Well Name: AMOCO LITTLE BOW 8-1-15-20
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0106912
License Date: 1984-05-02
License Status: RecExempt
Spud Date: 1984-05-05
Final Drill Date: 1984-05-10
Well Total Depth: 1240.00 m
Surface Hole Latitude: 50.229602
Surface Hole Longitude: -112.620963

For data sources see[1][2]

Well History

Date Event
1984-05-02 Obtained License
1984-05-10 Finished Drilling
1984-05-10 Well Mode changed to Drilled and Cased
1984-05-11 Drill Stem Test Performed
1984-05-12 Drill Stem Test Performed
1984-05-13 Production Casing Operation Performed
1984-06-10 Well Log Performed
1984-09-30 Well Log Performed
1984-10-01 Well Log Performed
1984-10-02 Perforation Treatment Performed - Jet Perforation
1998-02-17 Perforation Treatment Performed - Jet Perforation
1998-02-17 Well Log Performed
1998-02-20 Perforation Treatment Performed - Jet Perforation
1998-02-20 Well Log Performed
1998-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-10-19 Perforation Treatment Performed - Jet Perforation
1998-10-19 Plug Back Performed
1998-10-19 Well Log Performed
1998-10-20 Perforation Treatment Performed - Fractured
2002-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-21 Plug Back Performed
2002-02-22 Perforation Treatment Performed - Jet Perforation
2002-02-22 Well Log Performed
2002-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-23 Plug Back Performed
2002-02-24 Perforation Treatment Performed - Jet Perforation
2002-02-24 Well Log Performed
2002-02-26 Perforation Treatment Performed - Fractured
2002-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-23 Plug Back Performed
2002-09-23 Well Log Performed
2002-09-23 Well Mode changed to Abandoned Zone
2002-09-27 Perforation Treatment Performed - Cement Squeeze
2002-09-27 Perforation Treatment Performed - Jet Perforation
2002-09-27 Plug Back Performed
2002-11-09 Perforation Treatment Performed - Jet Perforation
2002-11-09 Well Log Performed
2002-11-12 Perforation Treatment Performed - Cement Squeeze
2002-11-12 Plug Back Performed
2002-11-19 Well Abandoned
2002-11-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-10-02 Perforation 1200.00 1203.50 7
2002-02-24 Perforation 377.00 382.00 17
2002-02-26 Fracture 377.00 382.00 0
2002-09-23 Packing Device Capped w/Cement 359.00 367.00 0
2002-09-27 Perforation 267.00 268.00 13
2002-09-27 Cement Squeeze 267.00 268.00 0
2002-11-09 Perforation 230.00 231.00 17
2002-11-12 Cement Squeeze 230.00 231.00 0
1998-02-17 Perforation 1194.50 1196.50 13
1998-02-20 Perforation 1166.00 1168.00 20
1998-10-19 Packing Device Capped w/Cement 1176.80 1184.80 0
1998-10-19 Perforation 1166.00 1168.00 13
1998-10-20 Fracture 1166.00 1168.00 0
2002-02-21 Packing Device Capped w/Cement 1149.80 1157.80 0
2002-02-22 Perforation 923.50 925.00 17
2002-02-23 Packing Device Capped w/Cement 909.30 917.30 0

For data sources see[4]



References