X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154192308000

Well Details

Well ID: 0154192308000
Loading map...
Location: 00/08-23-015-19W4/0
Location Alias: 00/08-23-15-19 W4M
Location Alias 2: 00/08-23-015-19 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 19
Section: 23
County/Municipality: Vulcan County
Well Name: CWNG ET AL LBOW 8-23-15-19
Operator Name: ATCO Gas And Pipelines Ltd.
License Number: 0078901
License Date: 1979-10-29
License Status: Abandoned
Spud Date: 1979-10-31
Final Drill Date: 1979-11-08
Well Total Depth: 1215.00 m
Surface Hole Latitude: 50.271275
Surface Hole Longitude: -112.504536

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-10-29 Obtained License
1979-11-08 Finished Drilling
1979-11-09 Drill Stem Test Performed
1979-11-09 Well Log Performed
1979-11-10 Drill Stem Test Performed
1979-11-11 Drill Stem Test Performed
1979-11-12 Drill Stem Test Performed
1979-11-13 Production Casing Operation Performed
1979-12-01 Perforation Treatment Performed - Jet Perforation
1979-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-12-03 Well Mode changed to Drilled and Cased
1984-03-14 Perforation Treatment Performed - Cement Squeeze
1984-03-16 Perforation Treatment Performed - Jet Perforation
1984-03-30 Well Began Production
1984-03-30 Well Fluid changed to Gas
1984-03-30 Well Mode changed to Flowing
1984-05-18 Perforation Treatment Performed - Jet Perforation
1985-06-04 Perforation Treatment Performed - Cement Squeeze
1985-06-04 Plug Back Performed
1985-06-04 Well Fluid changed to Gas
1985-06-04 Well Mode changed to Flowing
1985-06-05 Well Fluid changed to Gas
1985-06-05 Well Mode changed to Suspended
1988-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-10-28 Plug Back Performed
1988-10-28 Well Fluid changed to Gas
1988-10-28 Well Log Performed
1988-10-28 Well Mode changed to Abandoned Zone
1988-10-29 Perforation Treatment Performed - Jet Perforation
1990-08-12 Well Log Performed
1990-08-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-08-13 Plug Back Performed
1990-08-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-12-01 Perforation 1161.00 1162.50 13
1988-10-29 Perforation 975.20 976.00 13
1990-08-13 Packing Device Capped w/Cement 962.00 970.00 0
1979-12-03 Acid Treatment 1161.00 1162.50 0
1984-03-14 Cement Squeeze 1161.00 1162.50 0
1984-03-16 Perforation 1181.00 1183.00 13
1984-05-18 Perforation 966.00 967.00 13
1984-05-18 Perforation 962.00 963.00 13
1984-05-18 Perforation 946.50 948.50 13
1985-06-04 Cement Squeeze 946.50 967.00 0
1988-10-28 Packing Device Capped w/Cement 1168.00 1176.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 884 0.0 0.0 0.0

For data sources see[5]

References