If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0154191816000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.263274,"lon":-112.596871,"icon":""}]} |
Location: 00/16-18-015-19W4/0 | |
Location Alias: 00/16-18-15-19 W4M | |
Location Alias 2: 00/16-18-015-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 015 | |
Meridian: 4 | |
Range: 19 | |
Section: 18 | |
County/Municipality: Vulcan County | |
Well Name: NORCEN LITTLE BOW 16-18-15-19 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0034981 | |
License Date: 1968-10-15 | |
License Status: RecCertified | |
Spud Date: 1968-10-16 | |
Final Drill Date: 1968-10-25 | |
Well Total Depth: 1265.50 m | |
Surface Hole Latitude: 50.263274 | |
Surface Hole Longitude: -112.596871 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1968-10-15 | Obtained License |
1968-10-25 | Finished Drilling |
1968-10-25 | Well Mode changed to Drilled and Cased |
1968-10-26 | Production Casing Operation Performed |
1968-10-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1968-10-30 | Perforation Treatment Performed - Fractured |
1968-10-30 | Perforation Treatment Performed - Jet Perforation |
1968-12-08 | Well Began Production |
1968-12-08 | Well Fluid changed to Crude Oil |
1968-12-08 | Well Mode changed to Pumping |
1970-07-14 | Well Fluid changed to Crude Oil |
1970-07-14 | Well Mode changed to Suspended |
1983-08-15 | Perforation Treatment Performed - Jet Perforation |
1983-08-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-07-06 | Well Fluid changed to Crude Oil |
1994-07-06 | Well Mode changed to Pumping |
1997-10-01 | Well Fluid changed to Crude Oil |
1997-10-01 | Well Mode changed to Suspended |
1998-04-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-04-24 | Perforation Treatment Performed - Jet Perforation |
1998-04-24 | Plug Back Performed |
1998-04-24 | Well Fluid changed to Crude Oil |
1998-04-24 | Well Mode changed to Abandoned Zone |
1998-04-25 | Perforation Treatment Performed - Remedial Casing |
1998-06-09 | Well Abandoned |
1998-06-09 | Well Fluid changed to Crude Oil |
1998-06-09 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1968-10-30 | Perforation | 1187.50 | 1189.90 | 7 |
1968-10-30 | Acid Treatment | 1187.50 | 1189.90 | 0 |
1968-10-30 | Fracture | 1187.50 | 1189.90 | 0 |
1983-08-15 | Perforation | 1187.50 | 1189.90 | 13 |
1983-08-19 | Acid Treatment | 1187.50 | 1189.90 | 0 |
1998-04-24 | Packing Device Capped w/Cement | 1169.00 | 1177.00 | 0 |
1998-04-24 | Perforation | 245.00 | 246.00 | 10 |
1998-04-25 | Remedial Casing Cementing | 245.00 | 246.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1968 | 0 | 0.0 | 0.0 | 0.0 |
1969 | 236 | 0.0 | 0.0 | 0.0 |
1994 | 3356 | 0.0 | 0.0 | 0.0 |
For data sources see[5]