X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154181608000

Well Details

Well ID: 0154181608000
Loading map...
Location: 00/08-16-015-18W4/0
Location Alias: 00/08-16-15-18 W4M
Location Alias 2: 00/08-16-015-18 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 18
Section: 16
County/Municipality: Municipal District of Taber
Well Name: AMOCO LBOW 8-16-15-18
Operator Name: BP Canada Energy Group ULC
License Number: 0083307
License Date: 1980-06-06
License Status: RecCertified
Spud Date: 1980-06-21
Final Drill Date: 1980-06-28
Well Total Depth: 1150.00 m
Surface Hole Latitude: 50.255959
Surface Hole Longitude: -112.414906

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-06-06 Obtained License
1980-06-28 Finished Drilling
1980-06-29 Drill Stem Test Performed
1980-06-30 Production Casing Operation Performed
1980-08-08 Perforation Treatment Performed - Jet Perforation
1980-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-08-11 Perforation Treatment Performed - Jet Perforation
1980-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-08-15 Perforation Treatment Performed - Jet Perforation
1980-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-08-19 Perforation Treatment Performed - Jet Perforation
1980-08-19 Well Mode changed to Drilled and Cased
1990-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-07 Plug Back Performed
1990-03-07 Well Abandoned
1990-03-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-08-08 Perforation 1119.50 1120.50 13
1980-08-19 Perforation 913.00 914.50 13
1990-03-07 Packing Device Capped w/Cement 895.00 903.00 0
1980-08-09 Acid Treatment 1119.50 1120.50 0
1980-08-11 Packing Device Capped w/Cement 1118.50 1118.50 0
1980-08-11 Perforation 1113.50 1115.50 13
1980-08-13 Acid Treatment 1113.50 1115.50 0
1980-08-14 Packing Device Capped w/Cement 1111.20 1111.20 0
1980-08-15 Perforation 1099.50 1104.00 13
1980-08-16 Acid Treatment 1099.50 1104.00 0
1980-08-18 Packing Device Capped w/Cement 1085.00 1093.00 0

For data sources see[4]



References