If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0154153404000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.297597,"lon":-111.996986,"icon":""}]} |
Location: 00/04-34-015-15W4/0 | |
Location Alias: 00/04-34-15-15 W4M | |
Location Alias 2: 00/04-34-015-15 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 015 | |
Meridian: 4 | |
Range: 15 | |
Section: 34 | |
County/Municipality: County of Newell | |
Well Name: CVE ALDSON 4-34-15-15 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0127996 | |
License Date: 1987-08-20 | |
License Status: RecCertified | |
Spud Date: 1987-08-31 | |
Final Drill Date: 1987-09-03 | |
Well Total Depth: 1079.00 m | |
Surface Hole Latitude: 50.297597 | |
Surface Hole Longitude: -111.996986 |
Date | Event |
---|---|
1987-08-20 | Obtained License |
1987-09-01 | Surface Casing Operation Performed |
1987-09-03 | Finished Drilling |
1987-09-03 | Well Log Performed |
1987-09-03 | Well Mode changed to Drilled and Cased |
1987-09-05 | Production Casing Operation Performed |
1987-09-05 | Rig Released |
1987-10-18 | Well Log Performed |
1987-10-19 | Perforation Treatment Performed - Jet Perforation |
1987-11-18 | Well Began Production |
1987-11-18 | Well Fluid changed to Crude Oil |
1987-11-18 | Well Mode changed to Pumping |
1989-06-14 | Perforation Treatment Performed - Jet Perforation |
1989-06-15 | Perforation Treatment Performed - Cement Squeeze |
1989-06-20 | Perforation Treatment Performed - Jet Perforation |
1991-11-01 | Well Fluid changed to Crude Oil |
1991-11-01 | Well Mode changed to Suspended |
1993-05-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-05-28 | Plug Back Performed |
1993-05-28 | Well Log Performed |
1993-05-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-05-31 | Perforation Treatment Performed - Jet Perforation |
1993-05-31 | Perforation Treatment Performed - Remedial Casing |
1993-05-31 | Well Log Performed |
1993-06-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-06-01 | Perforation Treatment Performed - Jet Perforation |
1993-06-01 | Perforation Treatment Performed - Remedial Casing |
1993-07-29 | Well Log Performed |
1993-07-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-07-30 | Perforation Treatment Performed - Jet Perforation |
1993-07-30 | Perforation Treatment Performed - Remedial Casing |
1993-07-30 | Well Fluid changed to Crude Oil |
1993-07-30 | Well Log Performed |
1993-07-30 | Well Mode changed to Abandoned |
1993-10-20 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1987-10-19 | Perforation | 1025.00 | 1027.00 | 13 |
1993-06-01 | Acid Treatment | 206.50 | 207.50 | 0 |
1993-06-01 | Remedial Casing Cementing | 206.50 | 207.50 | 0 |
1993-07-30 | Perforation | 187.50 | 188.50 | 13 |
1993-07-30 | Acid Treatment | 187.50 | 188.50 | 0 |
1993-07-30 | Remedial Casing Cementing | 187.50 | 188.50 | 0 |
1989-06-14 | Perforation | 1032.00 | 1033.00 | 13 |
1989-06-15 | Cement Squeeze | 1025.00 | 1033.00 | 0 |
1989-06-20 | Perforation | 1025.00 | 1027.00 | 13 |
1993-05-28 | Packing Device Capped w/Cement | 1004.00 | 1012.00 | 0 |
1993-05-31 | Perforation | 244.00 | 245.00 | 13 |
1993-05-31 | Acid Treatment | 244.00 | 245.00 | 0 |
1993-05-31 | Remedial Casing Cementing | 244.00 | 245.00 | 0 |
1993-06-01 | Perforation | 206.50 | 207.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1987 | 972 | 0.0 | 0.0 | 0.0 |
1988 | 7999 | 0.0 | 0.0 | 0.0 |
1989 | 6492 | 0.0 | 0.0 | 0.0 |
1990 | 1336 | 0.0 | 0.0 | 0.0 |
1991 | 120 | 0.0 | 0.0 | 0.0 |
For data sources see[5]