X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154153216000

Well Details

Well ID: 0154153216000
Loading map...
Location: 00/16-32-015-15W4/0
Location Alias: 00/16-32-15-15 W4M
Location Alias 2: 00/16-32-015-15 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 15
Section: 32
County/Municipality: County of Newell
Well Name: CVE ALDSON 16-32-15-15
Operator Name: Cenovus Energy Inc.
License Number: 0105160
License Date: 1984-01-11
License Status: RecCertified
Spud Date: 1984-02-01
Final Drill Date: 1984-02-04
Well Total Depth: 1106.00 m
Surface Hole Latitude: 50.309478
Surface Hole Longitude: -112.024308

For data sources see[1][2]

Well History

Date Event
1984-01-11 Obtained License
1984-02-04 Finished Drilling
1984-02-04 Well Mode changed to Drilled and Cased
1984-02-05 Drill Stem Test Performed
1984-02-05 Well Log Performed
1984-02-06 Drill Stem Test Performed
1984-02-07 Production Casing Operation Performed
1984-02-22 Well Log Performed
1984-02-23 Well Log Performed
1984-02-24 Perforation Treatment Performed - Jet Perforation
1984-05-01 Well Began Production
1984-05-01 Well Fluid changed to Crude Oil
1984-05-01 Well Mode changed to Pumping
1992-08-01 Well Fluid changed to Crude Oil
1992-08-01 Well Mode changed to Suspended
1993-10-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-10-14 Plug Back Performed
1993-10-14 Well Fluid changed to Crude Oil
1993-10-14 Well Mode changed to Abandoned
1993-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-10-15 Perforation Treatment Performed - Jet Perforation
1993-10-15 Well Log Performed
1993-10-16 Perforation Treatment Performed - Remedial Casing
1993-12-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-02-24 Perforation 1013.20 1015.00 13
1993-10-14 Packing Device Capped w/Cement 997.00 1005.00 0
1993-10-15 Perforation 218.50 219.50 13
1993-10-15 Acid Treatment 218.50 219.50 0
1993-10-16 Remedial Casing Cementing 218.50 219.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 5188 0.0 0.0 0.0
1985 8235 0.0 0.0 0.0
1986 7911 0.0 0.0 0.0
1987 8523 0.0 0.0 0.0
1988 8372 0.0 0.0 0.0
1989 8499 0.0 0.0 0.0
1990 8013 0.0 0.0 0.0
1991 8164 0.0 0.0 0.0
1992 2031 0.0 0.0 0.0

For data sources see[5]

References