X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154152902000

Well Details

Well ID: 0154152902000
Loading map...
Location: 00/02-29-015-15W4/0
Location Alias: 00/02-29-15-15 W4M
Location Alias 2: 00/02-29-015-15 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 15
Section: 29
County/Municipality: County of Newell
Well Name: TXNE ALDSON 2-29-15-15
Operator Name: Torxen Energy Ltd.
License Number: 0137392
License Date: 1988-11-17
License Status: Issued
Spud Date: 1988-12-01
Final Drill Date: 1988-12-04
Well Total Depth: 1071.00 m
Surface Hole Latitude: 50.283174
Surface Hole Longitude: -112.031500

For data sources see[1][2]

Well History

Date Event
1988-11-17 Obtained License
1988-12-02 Surface Casing Operation Performed
1988-12-04 Finished Drilling
1988-12-04 Well Log Performed
1988-12-05 Drill Stem Test Performed
1988-12-05 Well Log Performed
1988-12-06 Drill Stem Test Performed
1988-12-07 Drill Stem Test Performed
1988-12-08 Production Casing Operation Performed
1988-12-08 Rig Released
1989-02-18 Well Log Performed
1989-02-23 Well Log Performed
1989-02-28 Well Log Performed
1989-03-01 Perforation Treatment Performed - Jet Perforation
1989-03-01 Perforation Treatment Performed - Remedial Casing
1989-03-16 Well Log Performed
1989-03-17 Perforation Treatment Performed - Jet Perforation
1989-03-21 Well Mode changed to Drilled and Cased
1989-07-01 Well Began Production
1989-07-01 Well Fluid changed to Crude Oil
1989-07-01 Well Mode changed to Pumping
1990-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-04-22 Plug Back Performed
1993-04-22 Well Fluid changed to Crude Oil
1993-04-22 Well Mode changed to Abandoned Zone
1993-04-23 Perforation Treatment Performed - Jet Perforation
1993-04-23 Well Log Performed
1993-04-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-01-27 Perforation Treatment Performed - Jet Perforation
2000-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-03-01 Perforation 390.00 391.00 13
2000-01-24 Acid Treatment 1017.00 1021.00 0
2019-06-26 Acid Treatment 1017.00 1021.00 0
1989-03-01 Remedial Casing Cementing 390.00 391.00 0
1989-03-17 Perforation 1049.00 1051.00 13
1990-08-14 Acid Treatment 1049.00 1051.00 0
1992-01-13 Acid Treatment 1049.00 1051.00 0
1993-04-22 Packing Device Capped w/Cement 1037.00 1045.00 0
1993-04-23 Perforation 1017.00 1021.00 13
1993-04-28 Acid Treatment 1017.00 1021.00 0
1998-01-27 Perforation 1017.00 1021.00 16

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 4137 0.0 0.0 0.0
1990 5480 0.0 0.0 0.0
1991 6375 0.0 0.0 0.0
1992 6157 0.0 0.0 0.0
1993 1192 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-06-26 No Incident Encountered 0.00 0.00

For data sources see[6]

References