If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0154152814000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.294996,"lon":-112.013962,"icon":""}]} |
Location: 00/14-28-015-15W4/0 | |
Location Alias: 00/14-28-15-15 W4M | |
Location Alias 2: 00/14-28-015-15 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 015 | |
Meridian: 4 | |
Range: 15 | |
Section: 28 | |
County/Municipality: County of Newell | |
Well Name: CVE ALDSON 14-28-15-15 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0107016 | |
License Date: 1984-05-10 | |
License Status: RecCertified | |
Spud Date: 1984-06-18 | |
Final Drill Date: 1984-06-21 | |
Well Total Depth: 1080.00 m | |
Surface Hole Latitude: 50.294996 | |
Surface Hole Longitude: -112.013962 |
Date | Event |
---|---|
1984-05-10 | Obtained License |
1984-06-19 | Surface Casing Operation Performed |
1984-06-21 | Finished Drilling |
1984-06-21 | Well Log Performed |
1984-06-21 | Well Mode changed to Drilled and Cased |
1984-06-22 | Drill Stem Test Performed |
1984-06-23 | Drill Stem Test Performed |
1984-06-24 | Production Casing Operation Performed |
1984-06-24 | Rig Released |
1984-10-02 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1984-10-02 | Well Log Performed |
1984-12-18 | Perforation Treatment Performed - Chemical Squeeze |
1985-01-09 | Perforation Treatment Performed - Fractured |
1985-02-14 | Well Began Production |
1985-02-14 | Well Fluid changed to Crude Oil |
1985-02-14 | Well Mode changed to Flowing |
1985-04-03 | Well Fluid changed to Crude Oil |
1985-04-03 | Well Mode changed to Pumping |
1993-05-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-05-12 | Perforation Treatment Performed - Jet Perforation |
1993-05-12 | Plug Back Performed |
1993-05-12 | Well Log Performed |
1993-05-13 | Perforation Treatment Performed - Remedial Casing |
1993-08-10 | Perforation Treatment Performed - Jet Perforation |
1993-08-10 | Well Log Performed |
1993-08-11 | Perforation Treatment Performed - Remedial Casing |
1993-08-11 | Well Fluid changed to Crude Oil |
1993-08-11 | Well Mode changed to Abandoned |
1993-12-09 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-10-02 | Hydra Jet Perforation | 1037.20 | 1042.00 | 0 |
1984-12-18 | Chemical Squeeze | 1037.20 | 1042.00 | 0 |
1985-01-09 | Fracture | 1037.20 | 1042.00 | 0 |
1993-05-12 | Packing Device Capped w/Cement | 1017.00 | 1025.00 | 0 |
1993-05-12 | Perforation | 229.50 | 230.50 | 13 |
1993-05-13 | Remedial Casing Cementing | 229.50 | 230.50 | 0 |
1993-08-10 | Perforation | 184.00 | 185.00 | 13 |
1993-08-11 | Remedial Casing Cementing | 184.00 | 185.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 4979 | 0.0 | 0.0 | 0.0 |
1986 | 7854 | 0.0 | 0.0 | 0.0 |
1987 | 7798 | 0.0 | 0.0 | 0.0 |
1988 | 7528 | 0.0 | 0.0 | 0.0 |
1989 | 4786 | 0.0 | 0.0 | 0.0 |
For data sources see[5]