X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154152809002

Well Details

Well ID: 0154152809002
Loading map...
Location: 00/09-28-015-15W4/2
Location Alias: 00/09-28-15-15 W4M
Location Alias 2: 00/09-28-015-15 W4/02
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 15
Section: 28
County/Municipality: County of Newell
Well Name: TXNE ALDSON 9-28-15-15
Operator Name: Torxen Energy Ltd.
License Number: 0102992
License Date: 1983-09-09
License Status: Issued
Spud Date: 1983-10-17
Final Drill Date: 1983-10-20
Well Total Depth: 1053.00 m
Surface Hole Latitude: 50.290613
Surface Hole Longitude: -112.001308

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-09-09 Obtained License
1983-10-20 Drill Stem Test Performed
1983-10-20 Finished Drilling
1983-10-21 Drill Stem Test Performed
1983-10-22 Production Casing Operation Performed
1983-11-04 Well Log Performed
1983-11-08 Perforation Treatment Performed - Jet Perforation
1989-07-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-07-25 Plug Back Performed
1989-07-25 Well Log Performed
1989-07-26 Perforation Treatment Performed - Jet Perforation
1989-07-27 Well Mode changed to Drilled and Cased
1991-05-08 Well Began Production
1991-05-08 Well Fluid changed to Gas
1991-05-08 Well Mode changed to Flowing
1994-12-02 Well Fluid changed to Gas
1994-12-02 Well Mode changed to Suspended
1997-07-03 Well Fluid changed to Gas
1997-07-03 Well Mode changed to Flowing
1999-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-07 Perforation Treatment Performed - Jet Perforation
1999-11-07 Plug Back Performed
1999-11-07 Well Fluid changed to Gas
1999-11-07 Well Mode changed to Abandoned Zone
1999-11-08 Well Log Performed
2001-09-16 Perforation Treatment Performed - Jet Perforation
2001-09-17 Well Log Performed
2001-11-04 Perforation Treatment Performed - Fractured
2005-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-08-31 Plug Back Performed
2005-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-09-01 Plug Back Performed
2005-09-03 Perforation Treatment Performed - Jet Perforation
2005-09-03 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-11-08 Perforation 1015.50 1016.30 13
2001-11-04 Fracture 819.80 820.80 0
2001-11-04 Fracture 801.00 802.00 0
2005-08-31 Packing Device Capped w/Cement 807.00 815.00 0
2005-09-01 Packing Device Capped w/Cement 787.00 795.00 0
2005-09-03 Perforation 660.00 662.00 7
1989-07-25 Packing Device Capped w/Cement 1011.00 1014.00 0
1989-07-26 Perforation 990.50 992.50 13
1989-07-26 Perforation 996.00 999.00 13
1999-11-07 Packing Device Capped w/Cement 977.00 987.00 0
1999-11-07 Perforation 819.80 820.80 17
1999-11-07 Perforation 801.00 802.00 17
2001-09-16 Perforation 833.80 839.20 17
2001-09-16 Perforation 840.00 843.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 682 0.0 0.0 0.0
1992 1638 0.0 0.0 0.0
1993 3711 0.0 0.0 0.0
1994 1701 0.0 0.0 0.0
1997 1937 0.0 0.0 0.0

For data sources see[5]

References