X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154152415004

Well Details

Well ID: 0154152415004
Loading map...
Location: 00/15-24-015-15W4/4
Location Alias: 00/15-24-15-15 W4M
Location Alias 2: 00/15-24-015-15 W4/04
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 15
Section: 24
County/Municipality: County of Newell
Well Name: TXNE ALDSON 15-24-15-15
Operator Name: Torxen Energy Ltd.
License Number: 0208439
License Date: 1997-11-12
License Status: Issued
Spud Date: 1998-01-31
Final Drill Date: 1998-02-04
Well Total Depth: 1079.00 m
Surface Hole Latitude: 50.277905
Surface Hole Longitude: -111.939573

For data sources see[1][2]

Well History

Date Event
1997-11-12 Obtained License
1998-02-01 Surface Casing Operation Performed
1998-02-04 Finished Drilling
1998-02-04 Well Mode changed to Drilled and Cased
1998-02-05 Well Log Performed
1998-02-06 Lost Circulation Occurred
1998-02-06 Production Casing Operation Performed
1998-02-06 Rig Released
1998-02-06 Well Log Performed
1999-11-23 Perforation Treatment Performed - Jet Perforation
1999-11-23 Well Log Performed
1999-12-01 Perforation Treatment Performed - Jet Perforation
1999-12-01 Well Log Performed
2000-11-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-11-19 Plug Back Performed
2000-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-11-20 Perforation Treatment Performed - Jet Perforation
2000-11-20 Plug Back Performed
2000-11-20 Well Log Performed
2002-06-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-21 Plug Back Performed
2002-06-22 Well Log Performed
2002-11-07 Well Log Performed
2002-11-14 Perforation Treatment Performed - Jet Perforation
2002-12-15 Perforation Treatment Performed - Fractured
2003-07-16 Well Began Production
2003-07-16 Well Fluid changed to Gas
2003-07-16 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-11-23 Perforation 838.80 839.50 17
1999-12-01 Perforation 805.80 806.40 20
2000-11-19 Packing Device Capped w/Cement 825.00 835.00 0
2000-11-20 Packing Device Capped w/Cement 789.00 799.00 0
2000-11-20 Perforation 761.00 761.50 17
2000-11-20 Perforation 757.00 757.50 17
2002-06-21 Packing Device Capped w/Cement 745.00 755.00 0
2002-11-14 Perforation 660.50 663.50 7
2002-12-15 Fracture 660.50 663.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 740 0.0 0.0 0.0
2005 5047 0.0 0.0 0.0
2006 8548 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8711 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8711 0.0 0.0 0.0
2016 8735 0.0 0.0 0.0
2017 8651 0.0 0.0 0.0
2018 8542 0.0 0.0 0.0
2019 8743 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1998-02-06 Lost Circulation 1079.00 1079.00

For data sources see[6]

References