X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154152202002

Well Details

Well ID: 0154152202002
Loading map...
Location: 00/02-22-015-15W4/2
Location Alias: 00/02-22-15-15 W4M
Location Alias 2: 00/02-22-015-15 W4/02
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 15
Section: 22
County/Municipality: County of Newell
Well Name: TXNE ALDSON 2-22-15-15
Operator Name: Torxen Energy Ltd.
License Number: 0087687
License Date: 1980-12-16
License Status: RecCertified
Spud Date: 1981-01-13
Final Drill Date: 1981-01-19
Well Total Depth: 1060.00 m
Surface Hole Latitude: 50.266728
Surface Hole Longitude: -111.985740

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-12-16 Obtained License
1981-01-19 Finished Drilling
1981-01-19 Well Mode changed to Drilled and Cased
1981-01-20 Drill Stem Test Performed
1981-01-21 Drill Stem Test Performed
1981-01-22 Drill Stem Test Performed
1981-01-23 Drill Stem Test Performed
1981-01-24 Production Casing Operation Performed
1981-02-08 Perforation Treatment Performed - Jet Perforation
1981-07-19 Perforation Treatment Performed - Fractured
1995-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-01-16 Plug Back Performed
2002-11-02 Well Log Performed
2002-11-07 Perforation Treatment Performed - Jet Perforation
2002-12-13 Perforation Treatment Performed - Fractured
2003-01-09 Well Fluid changed to Gas
2003-01-09 Well Mode changed to Testing
2007-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-24 Plug Back Performed
2007-11-24 Well Fluid changed to Gas
2007-11-24 Well Log Performed
2007-11-24 Well Mode changed to Abandoned Zone
2008-10-09 Well Abandoned
2008-10-09 Well Fluid changed to Gas
2008-10-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-02-08 Perforation 1022.50 1027.00 6
1981-07-19 Fracture 1022.50 1027.00 0
1995-01-16 Packing Device Capped w/Cement 1007.00 1015.00 0
2002-11-07 Perforation 648.00 651.00 7
2002-12-13 Fracture 648.00 651.00 0
2007-11-24 Packing Device Capped w/Cement 633.00 641.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 24 0.0 0.0 0.0

For data sources see[5]

References