X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154151502000

Well Details

Well ID: 0154151502000
Loading map...
Location: 00/02-15-015-15W4/0
Location Alias: 00/02-15-15-15 W4M
Location Alias 2: 00/02-15-015-15 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 15
Section: 15
County/Municipality: County of Newell
Well Name: TXNE ALDSON 2-15-15-15
Operator Name: Torxen Energy Ltd.
License Number: 0092364
License Date: 1981-09-24
License Status: Abandoned
Spud Date: 1981-09-24
Final Drill Date: 1981-09-28
Well Total Depth: 1053.00 m
Surface Hole Latitude: 50.253873
Surface Hole Longitude: -111.984736

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-09-24 Obtained License
1981-09-28 Finished Drilling
1981-09-28 Well Mode changed to Drilled and Cased
1981-09-30 Drill Stem Test Performed
1981-10-01 Production Casing Operation Performed
1981-12-01 Perforation Treatment Performed - Jet Perforation
1982-03-16 Well Began Production
1982-03-16 Well Fluid changed to Crude Oil
1982-03-16 Well Mode changed to Flowing
1982-08-17 Well Fluid changed to Crude Oil
1982-08-17 Well Mode changed to Suspended
1983-04-01 Well Fluid changed to Crude Oil
1983-04-01 Well Mode changed to Flowing
1988-06-04 Well Fluid changed to Crude Oil
1988-06-04 Well Mode changed to Suspended
1997-09-27 Well Fluid changed to Crude Oil
1997-09-27 Well Mode changed to Abandoned Zone
1997-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-29 Perforation Treatment Performed - Jet Perforation
2007-09-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-09-05 Plug Back Performed
2007-09-05 Well Log Performed
2007-10-15 Well Log Performed
2008-09-29 Perforation Treatment Performed - Abrasa-Jet Perforation
2008-09-30 Perforation Treatment Performed - Abrasa-Jet Perforation
2008-10-01 Perforation Treatment Performed - Cement Plug
2008-10-01 Perforation Treatment Performed - Remedial Casing
2008-10-01 Plug Back Performed
2009-07-27 Well Abandoned
2015-02-17 Well Log Performed
2016-03-29 Perforation Treatment Performed - Abrasa-Jet Perforation
2016-03-30 Perforation Treatment Performed - Abrasa-Jet Perforation
2016-03-30 Well Log Performed
2016-03-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-03-31 Perforation Treatment Performed - Remedial Casing
2016-03-31 Plug Back Performed
2016-03-31 Well Log Performed
2017-03-01 Perforation Treatment Performed - Abrasa-Jet Perforation
2017-03-01 Perforation Treatment Performed - Jet Perforation
2017-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-03 Perforation Treatment Performed - Cement Plug
2017-03-03 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-12-01 Perforation 988.50 990.00 13
2008-09-30 Hydra Jet Perforation 191.90 192.00 1
2008-09-30 Hydra Jet Perforation 190.90 191.00 1
2008-09-30 Hydra Jet Perforation 189.90 190.00 1
2008-09-30 Hydra Jet Perforation 188.90 189.00 1
2008-10-01 Remedial Casing Cementing 198.90 203.00 0
2008-10-01 Remedial Casing Cementing 188.90 192.00 0
2008-10-01 Cement Plug 165.00 222.00 0
2016-03-29 Hydra Jet Perforation 339.00 339.90 0
2016-03-29 Hydra Jet Perforation 340.20 340.50 0
2016-03-29 Hydra Jet Perforation 340.80 341.10 0
1997-09-28 Packing Device Capped w/Cement 977.00 985.00 0
2016-03-30 Hydra Jet Perforation 281.00 282.30 0
2016-03-31 Remedial Casing Cementing 339.00 341.10 0
2016-03-31 Remedial Casing Cementing 281.00 282.30 0
2016-03-31 Packing Device Capped w/Cement 329.00 338.00 0
2016-03-31 Packing Device Capped w/Cement 250.00 280.00 0
2017-03-01 Perforation 210.00 211.30 13
2017-03-01 Hydra Jet Perforation 188.90 189.00 0
2017-03-01 Hydra Jet Perforation 189.90 190.00 0
2017-03-01 Hydra Jet Perforation 190.90 191.00 0
2017-03-01 Hydra Jet Perforation 191.90 192.00 0
1997-09-29 Perforation 795.80 796.50 16
2017-03-01 Hydra Jet Perforation 198.90 199.00 0
2017-03-01 Hydra Jet Perforation 199.90 200.00 0
2017-03-01 Hydra Jet Perforation 200.90 201.00 0
2017-03-01 Hydra Jet Perforation 201.90 202.00 0
2017-03-01 Hydra Jet Perforation 202.90 203.00 0
2017-03-03 Remedial Casing Cementing 210.00 211.30 0
2017-03-03 Remedial Casing Cementing 188.90 203.00 0
2017-03-03 Cement Plug 207.40 211.30 0
2017-03-03 Packing Device Capped w/Cement 103.00 207.40 0
2007-09-05 Packing Device Capped w/Cement 784.00 792.00 0
2008-09-29 Hydra Jet Perforation 202.90 203.00 1
2008-09-29 Hydra Jet Perforation 201.90 202.00 1
2008-09-29 Hydra Jet Perforation 200.90 201.00 1
2008-09-29 Hydra Jet Perforation 199.90 200.00 1
2008-09-29 Hydra Jet Perforation 198.90 199.00 1

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 1384 0.0 0.0 0.0
1983 2272 0.0 0.0 0.0
1984 7815 0.0 0.0 0.0
1985 8122 0.0 0.0 0.0
1986 6533 0.0 0.0 0.0
1987 96 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-04-01 No Incident Encountered 0.00 0.00
2017-04-03 No Incident Encountered 0.00 0.00

For data sources see[6]

References