X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154142411002

Well Details

Well ID: 0154142411002
Loading map...
Location: 00/11-24-015-14W4/2
Location Alias: 00/11-24-15-14 W4M
Location Alias 2: 00/11-24-015-14 W4/02
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 14
Section: 24
County/Municipality: County of Newell
Well Name: TXNE 11D ALDSON 11-24-15-14
Operator Name: Torxen Energy Ltd.
License Number: 0221509
License Date: 1999-02-12
License Status: Amended
Spud Date: 1999-02-20
Final Drill Date: 1999-02-26
Well Total Depth: 1082.00 m
Surface Hole Latitude: 50.274234
Surface Hole Longitude: -111.802286

For data sources see[1][2]

Well History

Date Event
1999-02-12 Obtained License
1999-02-21 Direction Drilling Operation Performed - Deviate
1999-02-21 Surface Casing Operation Performed
1999-02-26 Finished Drilling
1999-02-26 Production Casing Operation Performed
1999-02-26 Well Log Performed
1999-02-26 Well Mode changed to Drilled and Cased
1999-02-27 Rig Released
1999-03-03 Well Log Performed
1999-03-09 Perforation Treatment Performed - Jet Perforation
1999-03-09 Well Log Performed
1999-03-31 Perforation Treatment Performed - Fractured
1999-05-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-05-05 Plug Back Performed
2000-08-02 Perforation Treatment Performed - Jet Perforation
2003-02-05 Well Log Performed
2003-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-06 Perforation Treatment Performed - Jet Perforation
2003-02-06 Plug Back Performed
2003-02-06 Well Log Performed
2003-02-12 Well Fluid changed to Gas
2003-02-12 Well Mode changed to Testing
2003-02-21 Well Began Production
2003-02-21 Well Fluid changed to Gas
2003-02-21 Well Mode changed to Flowing
2004-11-04 Well Log Performed
2004-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-06 Perforation Treatment Performed - Jet Perforation
2004-11-06 Plug Back Performed
2004-11-06 Well Fluid changed to Gas
2004-11-06 Well Mode changed to Abandoned Zone
2004-11-13 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-02-21 205.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-03-09 Perforation 893.50 894.50 20
1999-03-31 Fracture 893.50 894.50 0
1999-05-05 Packing Device Capped w/Cement 877.00 885.00 0
2000-08-02 Perforation 893.50 894.50 20
2003-02-06 Packing Device Capped w/Cement 862.00 870.00 0
2003-02-06 Perforation 826.50 827.00 20
2004-11-06 Packing Device Capped w/Cement 816.00 824.00 0
2004-11-06 Perforation 625.00 627.00 7
2004-11-13 Fracture 625.00 627.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 2968 0.0 0.0 0.0

For data sources see[6]

References