X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154141403000

Well Details

Well ID: 0154141403000
Loading map...
Location: 00/03-14-015-14W4/0
Location Alias: 00/03-14-15-14 W4M
Location Alias 2: 00/03-14-015-14 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 14
Section: 14
County/Municipality: County of Newell
Well Name: TXNE 16D-9 HZ ALDSON 3-14-15-14
Operator Name: Torxen Energy Ltd.
License Number: 0489393
License Date: 2018-06-01
License Status: Issued
Spud Date: 2018-08-31
Final Drill Date: 2018-09-07
Well Total Depth: 3292.00 m
Surface Hole Latitude: 50.250784
Surface Hole Longitude: -111.861644

For data sources see[1][2]

Well History

Date Event
2018-06-01 Obtained License
2018-09-01 Direction Drilling Operation Performed - Deviate
2018-09-01 Surface Casing Operation Performed
2018-09-02 Direction Drilling Operation Performed - Horizontal
2018-09-03 Intermediate Casing Operation Performed
2018-09-07 Finished Drilling
2018-09-07 Liner Casing Operation Performed
2018-09-07 Well Log Performed
2018-09-07 Well Mode changed to Drilled and Cased
2018-09-08 Perforation Treatment Performed - Open-Hole Completion
2018-09-08 Rig Released
2018-09-16 Well Log Performed
2018-09-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-18 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-19 Well Fluid changed to Crude Oil
2018-09-19 Well Mode changed to Drilling and Completing
2018-10-11 Well Began Production
2018-10-11 Well Fluid changed to Crude Oil
2018-10-11 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-08-31 Bonanza Drilling Inc. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-09-01 720.50 Deviate (5 - 79 degrees)
2018-09-02 1222.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-09-08 Open Hole/Barefoot Completion 1273.00 3292.00 0
2018-09-18 Multi-Stage Fracture 2466.60 2466.70 0
2018-09-18 Multi-Stage Fracture 2386.70 2386.80 0
2018-09-18 Multi-Stage Fracture 2294.30 2294.40 0
2018-09-18 Multi-Stage Fracture 2200.80 2200.90 0
2018-09-18 Multi-Stage Fracture 2108.90 2109.00 0
2018-09-18 Multi-Stage Fracture 2003.60 2003.70 0
2018-09-18 Multi-Stage Fracture 1923.40 1923.50 0
2018-09-18 Multi-Stage Fracture 1817.50 1817.60 0
2018-09-18 Multi-Stage Fracture 1711.90 1712.00 0
2018-09-18 Multi-Stage Fracture 1606.50 1606.60 0
2018-09-17 Multi-Stage Fracture 3216.70 3216.80 0
2018-09-18 Multi-Stage Fracture 1514.50 1514.60 0
2018-09-18 Multi-Stage Fracture 1422.20 1422.30 0
2018-09-18 Multi-Stage Fracture 1318.20 1318.30 0
2018-09-17 Multi-Stage Fracture 3123.60 3123.70 0
2018-09-17 Multi-Stage Fracture 3030.40 3030.50 0
2018-09-17 Multi-Stage Fracture 2938.90 2939.00 0
2018-09-17 Multi-Stage Fracture 2833.00 2833.10 0
2018-09-17 Multi-Stage Fracture 2767.20 2767.30 0
2018-09-18 Multi-Stage Fracture 2675.90 2676.00 0
2018-09-18 Multi-Stage Fracture 2572.20 2572.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-09-17 2018-09-18 1,007 0 N/A
2 2018-09-18 2018-09-18 1,007 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* 7732-18-5 100 75.398 N/A
YFFlex120. N002 Schlumberger Quartz. Crystalline silica 14808-60-7 100 18.6832 N/A
YFFlex120. N002 Schlumberger Energizing Fluid 1.2.4 Trimethylbenzene (impurity) 95-63-6 100 0.0002 N/A
2.2`.2-nitrilotriethanol"" 102-71-6 100 0.025 N/A
2-hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.1264 N/A
2-Propen-1-aminium. N.N-dimethyl-N-2-propen-1-yl-. chloride 26062-79-3 100 0.0022 N/A
Acetic acid 64-19-7 100 0.0009 N/A
Acetic acid. potassium salt 127-08-2 100 0.0001 N/A
Alcohol. C11-14. ethoxylated 78330-21-9 100 0.0095 N/A
Alcohols. C7-9-iso-. C8-rich. ethoxylated 78330-19-5 100 0.0146 N/A
Alcohols. C9-11-iso-. C10-rich. ethoxylated 78330-20-8 100 0.0136 N/A
Amines. dicoco alkylmethyl 61788-62-3 100 0 N/A
Benzenemethanaminium. N.N-dimethyl-N tetradecyl-. chloride 139-08-2 100 0.0011 N/A
Benzenemethanaminium. N-hexadecylN.N dimethyl-.chloride 122-18-9 100 0.0002 N/A
benzododecinium chloride 139-07-1 100 0.0032 N/A
Diammonium peroxidisulphate 7727-54-0 100 0.0196 N/A
Dicoco dimethyl quaternary ammonium chloride 61789-77-3 100 0.0003 N/A
Ethoxylated propoxylated 4-nonylphenol-formaldehyde resin 30846-35-6 100 0.0158 N/A
Glycerol 56-81-5 100 0.0148 N/A
Guar gum 9000-30-0 100 0.1583 N/A
Methanol 67-56-1 100 0.1241 N/A
N-Coco. 1.3-diaminopropane di-acetate 61791-64-8 100 0.0022 N/A
Naphthalene (Impurity) 91-20-3 100 0.0003 N/A
Nitrogen. liquid form 7727-37-9 100 5.2871 N/A
Non-crystalline silica (impurity) 7631-86-9 100 0.0003 N/A
Oxirane. Methyl-. polymer with Oxirane 11/6/9003 100 0.0214 N/A
Poly(oxy-1.2-ethanediyl).a-hydro-w-hydroxy-
Ethane-1.2-diol.
25322-68-3 100 0.0046 N/A
Polyethylene glycol monohexyl ether 31726-34-8 100 0.0044 N/A
Potassium borate 1332-77-0 100 0.0453 N/A
Potassium hydroxide 1310-58-3 100 0.0167 N/A
Potassium oleate 143-18-0 100 0.0002 N/A
Propan-2-ol 67-63-0 100 0.001 N/A
Solvent naphtha (petroleum). heavy arom. 64742-94-5 100 0.003 N/A
2 YFFlex120. N002 Schlumberger Energizing Fluid Dextrin 9004-53-9 100 0 N/A
Hemicellulase enzyme 9012-54-8 100 0 N/A
Lactose 63-42-3 100 0.0097 N/A
Maltodextrin 9050-36-6 100 0.0001 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-09-16 2018-09-18 Central Water Distribution Facility 153
2018-09-16 2018-09-18 Central Water Distribution Facility 611

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 1811 0.0 0.0 0.0
2019 8666 0.0 0.0 0.0
2020 2034 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-09-08 No Incident Encountered 0.00 0.00
2018-10-02 No Incident Encountered 0.00 0.00

For data sources see[10]

References