X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154140809000

Well Details

Well ID: 0154140809000
Loading map...
Location: 00/09-08-015-14W4/0
Location Alias: 00/09-08-15-14 W4M
Location Alias 2: 00/09-08-015-14 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 14
Section: 08
County/Municipality: County of Newell
Well Name: TXNE 15C-16 HZ ALDSON 9-8-15-14
Operator Name: Torxen Energy Ltd.
License Number: 0497333
License Date: 2020-01-10
License Status: Issued
Spud Date: 2020-02-13
Final Drill Date: 2020-02-20
Well Total Depth: 3889.00 m
Surface Hole Latitude: 50.265665
Surface Hole Longitude: -111.871033

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-02-13 Bonanza Drilling Inc. 5 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-02-15 795.50 Deviate (5 - 79 degrees)
2020-02-15 1115.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-02-21 Open Hole/Barefoot Completion 1173.00 3889.00 0
2020-03-08 Multi-Stage Fracture 2623.70 2623.80 0
2020-03-08 Multi-Stage Fracture 2527.70 2527.80 0
2020-03-08 Multi-Stage Fracture 2459.20 2459.30 0
2020-03-08 Multi-Stage Fracture 2404.10 2404.20 0
2020-03-08 Multi-Stage Fracture 2325.90 2326.00 0
2020-03-08 Multi-Stage Fracture 2217.30 2217.40 0
2020-03-08 Multi-Stage Fracture 2083.20 2083.30 0
2020-03-08 Multi-Stage Fracture 2027.90 2028.00 0
2020-03-08 Multi-Stage Fracture 1959.70 1959.80 0
2020-03-08 Multi-Stage Fracture 1852.90 1853.00 0
2020-03-08 Multi-Stage Fracture 3551.60 3551.70 0
2020-03-08 Multi-Stage Fracture 1691.20 1691.30 0
2020-03-08 Multi-Stage Fracture 1636.00 1636.10 0
2020-03-08 Multi-Stage Fracture 1581.30 1581.40 0
2020-03-09 Multi-Stage Fracture 1486.20 1486.30 0
2020-03-09 Multi-Stage Fracture 1390.30 1390.40 0
2020-03-09 Multi-Stage Fracture 1293.90 1294.00 0
2020-03-09 Multi-Stage Fracture 1199.70 1199.80 0
2020-03-08 Multi-Stage Fracture 3471.70 3471.80 0
2020-03-08 Multi-Stage Fracture 3255.10 3255.20 0
2020-03-08 Multi-Stage Fracture 3160.90 3161.00 0
2020-03-08 Multi-Stage Fracture 3083.10 3083.20 0
2020-03-08 Multi-Stage Fracture 2975.00 2975.10 0
2020-03-08 Multi-Stage Fracture 2907.00 2907.10 0
2020-03-08 Multi-Stage Fracture 2703.60 2703.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-21 No Incident Encountered 0.00 0.00
2020-03-18 No Incident Encountered 0.00 0.00

For data sources see[7]

References