X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154132305002

Well Details

Well ID: 0154132305002
Loading map...
Location: 00/05-23-015-13W4/2
Location Alias: 00/05-23-15-13 W4M
Location Alias 2: 00/05-23-015-13 W4/02
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 13
Section: 23
County/Municipality: County of Newell
Well Name: TXNE 8-22DV ALDSON 5-23-15-13
Operator Name: Torxen Energy Ltd.
License Number: 0478229
License Date: 2015-12-04
License Status: Issued
Spud Date: 2015-12-18
Final Drill Date: 2015-12-20
Well Total Depth: 1157.00 m
Surface Hole Latitude: 50.270610
Surface Hole Longitude: -111.702956

For data sources see[1][2]

Well History

Date Event
2015-12-04 Obtained License
2015-12-18 Surface Casing Operation Performed
2015-12-19 Direction Drilling Operation Performed - Deviate
2015-12-20 Finished Drilling
2015-12-20 Well Log Performed
2015-12-20 Well Mode changed to Drilled and Cased
2015-12-21 Production Casing Operation Performed
2015-12-21 Rig Released
2016-07-20 Perforation Treatment Performed - Jet Perforation
2016-07-20 Well Log Performed
2016-08-15 Perforation Treatment Performed - Fractured
2016-09-12 Well Log Performed
2018-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-06-28 Plug Back Performed
2018-06-28 Well Log Performed
2018-07-01 Perforation Treatment Performed - Jet Perforation
2018-07-01 Well Log Performed
2018-07-04 Well Log Performed
2018-11-23 Well Began Injection
2018-11-23 Well Fluid changed to Water
2018-11-23 Well Type changed to Disposal

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2015-12-19 222.80 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-07-20 Perforation 1126.50 1130.50 20
2018-07-01 Perforation 781.00 793.00 20
2016-08-15 Fracture 1126.50 1130.50 0
2018-06-28 Packing Device Capped w/Cement 1109.00 1117.00 0
2018-06-28 Packing Device Capped w/Cement 918.00 926.00 0
2018-07-01 Perforation 897.00 903.00 20
2018-07-01 Perforation 831.00 834.50 20
2018-07-01 Perforation 823.00 827.00 20
2018-07-01 Perforation 811.00 821.00 20
2018-07-01 Perforation 798.50 807.50 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-12-21 No Incident Encountered 0.00 0.00
2016-09-12 No Incident Encountered 0.00 0.00
2018-06-28 No Incident Encountered 0.00 0.00
2018-07-06 No Incident Encountered 0.00 0.00
2019-03-05 No Incident Encountered 0.00 0.00

For data sources see[7]

References