If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0154132305002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.27061,"lon":-111.702956,"icon":""}]} |
Location: 00/05-23-015-13W4/2 | |
Location Alias: 00/05-23-15-13 W4M | |
Location Alias 2: 00/05-23-015-13 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 015 | |
Meridian: 4 | |
Range: 13 | |
Section: 23 | |
County/Municipality: County of Newell | |
Well Name: TXNE 8-22DV ALDSON 5-23-15-13 | |
Operator Name: Torxen Energy Ltd. | |
License Number: 0478229 | |
License Date: 2015-12-04 | |
License Status: Issued | |
Spud Date: 2015-12-18 | |
Final Drill Date: 2015-12-20 | |
Well Total Depth: 1157.00 m | |
Surface Hole Latitude: 50.270610 | |
Surface Hole Longitude: -111.702956 |
Date | Event |
---|---|
2015-12-04 | Obtained License |
2015-12-18 | Surface Casing Operation Performed |
2015-12-19 | Direction Drilling Operation Performed - Deviate |
2015-12-20 | Finished Drilling |
2015-12-20 | Well Log Performed |
2015-12-20 | Well Mode changed to Drilled and Cased |
2015-12-21 | Production Casing Operation Performed |
2015-12-21 | Rig Released |
2016-07-20 | Perforation Treatment Performed - Jet Perforation |
2016-07-20 | Well Log Performed |
2016-08-15 | Perforation Treatment Performed - Fractured |
2016-09-12 | Well Log Performed |
2018-06-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-06-28 | Plug Back Performed |
2018-06-28 | Well Log Performed |
2018-07-01 | Perforation Treatment Performed - Jet Perforation |
2018-07-01 | Well Log Performed |
2018-07-04 | Well Log Performed |
2018-11-23 | Well Began Injection |
2018-11-23 | Well Fluid changed to Water |
2018-11-23 | Well Type changed to Disposal |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2015-12-19 | 222.80 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-07-20 | Perforation | 1126.50 | 1130.50 | 20 |
2018-07-01 | Perforation | 781.00 | 793.00 | 20 |
2016-08-15 | Fracture | 1126.50 | 1130.50 | 0 |
2018-06-28 | Packing Device Capped w/Cement | 1109.00 | 1117.00 | 0 |
2018-06-28 | Packing Device Capped w/Cement | 918.00 | 926.00 | 0 |
2018-07-01 | Perforation | 897.00 | 903.00 | 20 |
2018-07-01 | Perforation | 831.00 | 834.50 | 20 |
2018-07-01 | Perforation | 823.00 | 827.00 | 20 |
2018-07-01 | Perforation | 811.00 | 821.00 | 20 |
2018-07-01 | Perforation | 798.50 | 807.50 | 20 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-12-21 | No Incident Encountered | 0.00 | 0.00 |
2016-09-12 | No Incident Encountered | 0.00 | 0.00 |
2018-06-28 | No Incident Encountered | 0.00 | 0.00 |
2018-07-06 | No Incident Encountered | 0.00 | 0.00 |
2019-03-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]