X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154132210020

Well Details

Well ID: 0154132210020
Loading map...
Location: 02/10-22-015-13W4/0
Location Alias: 02/10-22-15-13 W4M
Location Alias 2: 02/10-22-015-13 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 13
Section: 22
County/Municipality: County of Newell
Well Name: TXNE 10D ALDSON 10-22-15-13
Operator Name: Torxen Energy Ltd.
License Number: 0207066
License Date: 1997-10-08
License Status: Suspension
Spud Date: 1997-10-21
Final Drill Date: 1997-10-29
Well Total Depth: 1350.00 m
Surface Hole Latitude: 50.276268
Surface Hole Longitude: -111.705905

For data sources see[1][2]

Well History

Date Event
1997-10-08 Obtained License
1997-10-22 Surface Casing Operation Performed
1997-10-29 Finished Drilling
1997-10-29 Well Log Performed
1997-10-31 Production Casing Operation Performed
1997-10-31 Rig Released
1997-10-31 Well Mode changed to Drilled and Cased
2003-09-15 Well Log Performed
2003-09-16 Perforation Treatment Performed - Jet Perforation
2003-09-23 Well Fluid changed to Gas
2003-09-23 Well Mode changed to Testing
2003-09-28 Well Log Performed
2003-10-23 Perforation Treatment Performed - Fractured
2004-04-22 Well Began Production
2004-04-22 Well Fluid changed to Gas
2004-04-22 Well Mode changed to Flowing
2005-12-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-12-22 Plug Back Performed
2005-12-22 Well Fluid changed to Gas
2005-12-22 Well Mode changed to Abandoned Zone
2006-01-03 Perforation Treatment Performed - Jet Perforation
2006-01-16 Perforation Treatment Performed - Fractured
2010-09-23 Perforation Treatment Performed - Cement Squeeze
2010-09-25 Perforation Treatment Performed - Jet Perforation
2010-09-27 Perforation Treatment Performed - Cement Squeeze
2010-09-30 Perforation Treatment Performed - Jet Perforation
2010-09-30 Well Log Performed
2010-10-05 Perforation Treatment Performed - Jet Perforation
2010-10-05 Well Log Performed
2010-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-09-16 Perforation 932.00 935.00 17
2010-09-27 Cement Squeeze 930.00 935.00 0
2010-09-30 Perforation 1006.00 1010.00 17
2010-09-30 Perforation 1010.00 1014.00 17
2010-10-05 Perforation 988.00 992.00 17
2010-10-08 Acid Treatment 988.00 992.00 0
2003-09-16 Perforation 930.00 932.00 17
2003-10-23 Fracture 930.00 935.00 0
2005-12-22 Packing Device Capped w/Cement 915.00 923.00 0
2006-01-03 Perforation 611.00 613.00 7
2006-01-16 Fracture 611.00 613.00 0
2010-09-23 Cement Squeeze 611.00 613.00 0
2010-09-25 Perforation 930.00 932.00 17
2010-09-25 Perforation 932.00 935.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 24 0.0 0.0 0.0
2004 2155 0.0 0.0 0.0

For data sources see[5]

References