X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154130909000

Well Details

Well ID: 0154130909000
Loading map...
Location: 00/09-09-015-13W4/0
Location Alias: 00/09-09-15-13 W4M
Location Alias 2: 00/09-09-015-13 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 13
Section: 09
County/Municipality: County of Newell
Well Name: TXNE ALDSON 9-9-15-13
Operator Name: Torxen Energy Ltd.
License Number: 0267266
License Date: 2002-02-04
License Status: Issued
Spud Date: 2002-02-10
Final Drill Date: 2002-02-17
Well Total Depth: 1135.00 m
Surface Hole Latitude: 50.245152
Surface Hole Longitude: -111.731467

For data sources see[1][2]

Well History

Date Event
2002-02-04 Obtained License
2002-02-10 Surface Casing Operation Performed
2002-02-12 Direction Drilling Operation Performed - Deviate
2002-02-17 Finished Drilling
2002-02-17 Well Log Performed
2002-02-18 Production Casing Operation Performed
2002-02-18 Rig Released
2002-02-18 Well Log Performed
2002-02-18 Well Mode changed to Drilled and Cased
2002-03-08 Perforation Treatment Performed - Jet Perforation
2002-03-08 Well Log Performed
2002-03-15 Well Began Production
2002-03-15 Well Fluid changed to Crude Oil
2002-03-15 Well Mode changed to Flowing
2002-03-16 Well Fluid changed to Crude Oil
2002-03-16 Well Mode changed to Suspended
2002-03-24 Well Log Performed
2002-05-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-05-02 Plug Back Performed
2002-05-02 Well Fluid changed to Crude Oil
2002-05-02 Well Log Performed
2002-05-02 Well Mode changed to Abandoned Zone
2002-05-05 Well Log Performed
2002-05-19 Well Log Performed
2002-05-31 Perforation Treatment Performed - Jet Perforation
2002-06-17 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-02-12 233.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-03-08 Perforation 1095.80 1099.00 17
2002-05-02 Packing Device Capped w/Cement 1083.00 1091.00 0
2002-05-31 Perforation 633.00 636.00 7
2002-06-17 Fracture 633.00 636.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 4 0.0 0.0 0.0

For data sources see[6]

References