X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154123509000

Well Details

Well ID: 0154123509000
Loading map...
Location: 00/09-35-015-12W4/0
Location Alias: 00/09-35-15-12 W4M
Location Alias 2: 00/09-35-015-12 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 12
Section: 35
County/Municipality: County of Newell
Well Name: CARDINAL ALDSON 9-35-15-12
Operator Name: Cardinal Energy Ltd.
License Number: 0202455
License Date: 1997-06-11
License Status: Suspension
Spud Date: 1997-07-31
Final Drill Date: 1997-08-05
Well Total Depth: 1195.00 m
Surface Hole Latitude: 50.306869
Surface Hole Longitude: -111.549051

For data sources see[1][2]

Well History

Date Event
1997-06-11 Obtained License
1997-08-01 Direction Drilling Operation Performed - Deviate
1997-08-01 Surface Casing Operation Performed
1997-08-05 Finished Drilling
1997-08-05 Well Log Performed
1997-08-06 Production Casing Operation Performed
1997-08-06 Rig Released
1997-08-06 Well Mode changed to Drilled and Cased
1997-08-10 Well Log Performed
1997-09-02 Well Log Performed
2000-04-14 Perforation Treatment Performed - Jet Perforation
2000-04-14 Well Log Performed
2001-01-01 Well Began Production
2001-01-01 Well Fluid changed to Water
2001-01-01 Well Type changed to Source
2006-07-29 Well Fluid changed to Water
2006-07-29 Well Mode changed to Suspended
2006-07-29 Well Type changed to Source
2010-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-27 Plug Back Performed
2010-08-27 Well Fluid changed to Water
2010-08-27 Well Mode changed to Abandoned Zone
2010-08-27 Well Type changed to Source

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-08-01 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-04-14 Perforation 882.50 886.50 17
2000-04-14 Perforation 878.50 882.50 17
2000-04-14 Perforation 872.00 875.50 17
2000-04-14 Perforation 869.00 870.50 17
2010-08-27 Packing Device Capped w/Cement 854.00 865.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-08-27 No Incident Encountered 0.00 0.00

For data sources see[7]

References