X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154121102000

Well Details

Well ID: 0154121102000
Loading map...
Location: 00/02-11-015-12W4/0
Location Alias: 00/02-11-15-12 W4M
Location Alias 2: 00/02-11-015-12 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 12
Section: 11
County/Municipality: County of Newell
Well Name: CNRL UNIT ALDERSON 2-11-15-12
Operator Name: Canadian Natural Resources Limited
License Number: 0286594
License Date: 2003-05-02
License Status: RecCertified
Spud Date: 2003-08-22
Final Drill Date: 2003-08-26
Well Total Depth: 575.00 m
Surface Hole Latitude: 50.238899
Surface Hole Longitude: -111.548282

For data sources see[1][2]

Well History

Date Event
2003-05-02 Obtained License
2003-08-22 Surface Casing Operation Performed
2003-08-26 Finished Drilling
2003-08-26 Production Casing Operation Performed
2003-08-26 Well Mode changed to Drilled and Cased
2003-08-27 Rig Released
2003-08-29 Well Log Performed
2003-10-26 Perforation Treatment Performed - Jet Perforation
2003-11-10 Perforation Treatment Performed - Fractured
2003-11-12 Perforation Treatment Performed - Jet Perforation
2003-11-13 Perforation Treatment Performed - Fractured
2003-12-08 Well Began Production
2003-12-08 Well Fluid changed to Gas
2003-12-08 Well Mode changed to Flowing
2009-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-09-01 Plug Back Performed
2009-09-01 Well Fluid changed to Gas
2009-09-01 Well Log Performed
2009-09-01 Well Mode changed to Abandoned Zone
2009-09-09 Well Abandoned
2009-09-09 Well Fluid changed to Gas
2009-09-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-10-26 Perforation 387.00 388.00 7
2003-11-12 Perforation 283.00 284.00 7
2003-11-12 Perforation 291.00 292.00 7
2003-11-12 Perforation 299.00 300.00 7
2003-11-12 Perforation 314.00 315.00 7
2003-11-12 Perforation 322.00 323.00 7
2003-11-12 Perforation 330.00 331.00 7
2003-11-12 Perforation 338.00 339.00 7
2003-11-13 Fracture 258.00 339.00 0
2009-08-30 Packing Device Capped w/Cement 372.00 380.00 0
2009-09-01 Packing Device Capped w/Cement 245.00 253.00 0
2003-10-26 Perforation 396.00 397.00 7
2003-10-26 Perforation 429.00 430.00 7
2003-10-26 Perforation 536.00 537.00 7
2003-10-26 Perforation 545.00 546.00 7
2003-11-10 Fracture 387.00 546.00 0
2003-11-12 Perforation 258.00 259.00 7
2003-11-12 Perforation 266.00 267.00 7
2003-11-12 Perforation 274.00 275.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 744 0.0 0.0 0.0
2004 8779 0.0 0.0 0.0
2005 8758 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 6541 0.0 0.0 0.0
2008 7290 0.0 0.0 0.0
2009 5076 0.0 0.0 0.0

For data sources see[5]

References