X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154113115000

Well Details

Well ID: 0154113115000
Loading map...
Location: 00/15-31-015-11W4/0
Location Alias: 00/15-31-15-11 W4M
Location Alias 2: 00/15-31-015-11 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 11
Section: 31
County/Municipality: County of Newell
Well Name: CNRL UNIT ALDERSON 15-31-15-11
Operator Name: Canadian Natural Resources Limited
License Number: 0256996
License Date: 2001-07-05
License Status: Issued
Spud Date: 2001-08-22
Final Drill Date: 2001-09-05
Well Total Depth: 512.00 m
Surface Hole Latitude: 50.306984
Surface Hole Longitude: -111.502435

For data sources see[1][2]

Well History

Date Event
2001-07-05 Obtained License
2001-08-22 Surface Casing Operation Performed
2001-09-05 Finished Drilling
2001-09-05 Production Casing Operation Performed
2001-09-05 Rig Released
2001-09-05 Well Mode changed to Drilled and Cased
2001-09-14 Well Log Performed
2001-10-01 Perforation Treatment Performed - Jet Perforation
2001-10-02 Perforation Treatment Performed - Fractured
2001-10-04 Perforation Treatment Performed - Jet Perforation
2001-10-05 Perforation Treatment Performed - Fractured
2001-10-19 Well Began Production
2001-10-19 Well Fluid changed to Gas
2001-10-19 Well Mode changed to Flowing
2012-01-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-03-17 Well Log Performed
2016-03-18 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-10-01 Perforation 507.00 508.00 7
2001-10-01 Perforation 407.00 408.00 7
2001-10-02 Fracture 407.00 508.00 0
2001-10-04 Perforation 363.00 364.00 7
2001-10-04 Perforation 355.00 357.00 7
2001-10-04 Perforation 347.00 348.00 7
2001-10-04 Perforation 338.00 340.00 7
2001-10-04 Perforation 329.00 330.00 7
2001-10-04 Perforation 320.00 322.00 7
2001-10-04 Perforation 312.00 314.00 7
2001-10-04 Perforation 304.00 305.00 7
2001-10-01 Perforation 500.00 501.00 7
2001-10-04 Perforation 296.00 298.00 7
2001-10-04 Perforation 288.00 289.00 7
2001-10-04 Perforation 280.00 282.00 7
2001-10-05 Fracture 280.00 364.00 0
2012-01-06 Packing Device Capped w/Cement 478.00 486.00 0
2016-03-18 Perforation 176.00 177.00 12
2016-03-18 Perforation 179.50 180.50 12
2016-03-18 Perforation 183.00 184.00 12
2001-10-01 Perforation 493.00 494.00 7
2001-10-01 Perforation 456.00 457.00 7
2001-10-01 Perforation 445.00 447.00 7
2001-10-01 Perforation 436.00 438.00 7
2001-10-01 Perforation 427.00 428.00 7
2001-10-01 Perforation 420.00 421.00 7
2001-10-01 Perforation 414.00 415.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1752 0.0 0.0 0.0
2002 8758 0.0 0.0 0.0
2003 8757 0.0 0.0 0.0
2004 8780 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8735 0.0 0.0 0.0
2008 8779 0.0 0.0 0.0
2009 8686 0.0 0.0 0.0
2010 8750 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8760 0.0 0.0 0.0
2015 8652 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 8519 0.0 0.0 0.0
2018 8594 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-03-18 No Incident Encountered 0.00 0.00

For data sources see[6]

References