If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0154112512000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.288473,"lon":-111.401472,"icon":""}]} |
Location: 00/12-25-015-11W4/0 | |
Location Alias: 00/12-25-15-11 W4M | |
Location Alias 2: 00/12-25-015-11 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 015 | |
Meridian: 4 | |
Range: 11 | |
Section: 25 | |
County/Municipality: County of Newell | |
Well Name: CNRL ALDERSON 12-25-15-11 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0108190 | |
License Date: 1984-07-13 | |
License Status: RecCertified | |
Spud Date: 1984-07-18 | |
Final Drill Date: 1984-07-19 | |
Well Total Depth: 440.00 m | |
Surface Hole Latitude: 50.288473 | |
Surface Hole Longitude: -111.401472 |
Date | Event |
---|---|
1984-07-13 | Obtained License |
1984-07-18 | Conductor Casing Operation Performed |
1984-07-19 | Finished Drilling |
1984-07-19 | Perforation Treatment Performed - Open-Hole Completion |
1984-07-19 | Production Casing Operation Performed |
1984-07-19 | Rig Released |
1984-07-19 | Well Mode changed to Drilled and Cased |
1984-07-20 | Well Log Performed |
1984-09-19 | Well Began Production |
1984-09-19 | Well Fluid changed to Gas |
1984-09-19 | Well Mode changed to Flowing |
2009-12-31 | Well Fluid changed to Gas |
2009-12-31 | Well Mode changed to Suspended |
2011-08-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-08-10 | Plug Back Performed |
2011-08-10 | Well Fluid changed to Gas |
2011-08-10 | Well Mode changed to Abandoned Zone |
2011-08-19 | Well Abandoned |
2011-08-19 | Well Fluid changed to Gas |
2011-08-19 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-07-19 | Open Hole/Barefoot Completion | 281.30 | 440.00 | 0 |
2011-08-10 | Packing Device Capped w/Cement | 262.50 | 270.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 2469 | 0.0 | 0.0 | 0.0 |
1985 | 8265 | 0.0 | 0.0 | 0.0 |
1986 | 7058 | 0.0 | 0.0 | 0.0 |
1987 | 7095 | 0.0 | 0.0 | 0.0 |
1988 | 8484 | 0.0 | 0.0 | 0.0 |
1989 | 8565 | 0.0 | 0.0 | 0.0 |
1990 | 8392 | 0.0 | 0.0 | 0.0 |
1991 | 8129 | 0.0 | 0.0 | 0.0 |
1992 | 8618 | 0.0 | 0.0 | 0.0 |
1993 | 8641 | 0.0 | 0.0 | 0.0 |
1994 | 8745 | 0.0 | 0.0 | 0.0 |
1995 | 8668 | 0.0 | 0.0 | 0.0 |
1996 | 8610 | 0.0 | 0.0 | 0.0 |
1997 | 8719 | 0.0 | 0.0 | 0.0 |
1998 | 8626 | 0.0 | 0.0 | 0.0 |
1999 | 8723 | 0.0 | 0.0 | 0.0 |
2000 | 8754 | 0.0 | 0.0 | 0.0 |
2001 | 8712 | 0.0 | 0.0 | 0.0 |
2002 | 8735 | 0.0 | 0.0 | 0.0 |
2003 | 8732 | 0.0 | 0.0 | 0.0 |
2004 | 8780 | 0.0 | 0.0 | 0.0 |
2005 | 8759 | 0.0 | 0.0 | 0.0 |
2006 | 8039 | 0.0 | 0.0 | 0.0 |
2007 | 8709 | 0.0 | 0.0 | 0.0 |
2008 | 8779 | 0.0 | 0.0 | 0.0 |
2009 | 4270 | 0.0 | 0.0 | 0.0 |
For data sources see[5]