X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154111111000

Well Details

Well ID: 0154111111000
Loading map...
Location: 00/11-11-015-11W4/0
Location Alias: 00/11-11-15-11 W4M
Location Alias 2: 00/11-11-015-11 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 11
Section: 11
County/Municipality: County of Newell
Well Name: CNRL ALDERSON 11-11-15-11
Operator Name: Canadian Natural Resources Limited
License Number: 0043416
License Date: 1972-08-30
License Status: Issued
Spud Date: 1972-09-10
Final Drill Date: 1972-09-12
Well Total Depth: 349.00 m
Surface Hole Latitude: 50.247104
Surface Hole Longitude: -111.419216

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-08-30 Obtained License
1972-09-12 Finished Drilling
1972-09-12 Production Casing Operation Performed
1972-09-12 Well Mode changed to Drilled and Cased
1972-10-12 Perforation Treatment Performed - Abrasa-Jet Perforation
1972-11-01 Well Began Production
1972-11-01 Well Fluid changed to Gas
1972-11-01 Well Mode changed to Flowing
1989-05-08 Well Log Performed
1989-06-13 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-10-12 Hydra Jet Perforation 273.40 278.90 0
1989-06-13 Perforation 256.00 260.00 3
1989-06-13 Perforation 265.00 268.00 3
1989-06-13 Perforation 270.00 272.00 3
1989-06-13 Perforation 277.00 286.00 3
1989-06-13 Perforation 289.00 291.00 3
1989-06-13 Perforation 295.00 297.00 3
1989-06-13 Perforation 305.00 309.00 3
1989-06-13 Perforation 322.00 325.00 3
1972-10-12 Hydra Jet Perforation 280.10 280.70 0
1972-10-12 Hydra Jet Perforation 281.30 282.50 0
1972-10-12 Hydra Jet Perforation 283.80 285.30 0
1972-10-12 Hydra Jet Perforation 285.90 291.10 0
1972-10-12 Hydra Jet Perforation 291.70 296.60 0
1972-10-12 Hydra Jet Perforation 306.90 307.80 0
1972-10-12 Hydra Jet Perforation 323.70 324.30 0
1972-10-12 Hydra Jet Perforation 324.90 324.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 1376 0.0 0.0 0.0
1973 8418 0.0 0.0 0.0
1974 8394 0.0 0.0 0.0
1975 8484 0.0 0.0 0.0
1976 8703 0.0 0.0 0.0
1977 8512 0.0 0.0 0.0
1978 7875 0.0 0.0 0.0
1979 7351 0.0 0.0 0.0
1980 8226 0.0 0.0 0.0
1981 8127 0.0 0.0 0.0
1982 7061 0.0 0.0 0.0
1983 5630 0.0 0.0 0.0
1984 8578 0.0 0.0 0.0
1985 8264 0.0 0.0 0.0
1986 7358 0.0 0.0 0.0
1987 7367 0.0 0.0 0.0
1988 8490 0.0 0.0 0.0
1989 8476 0.0 0.0 0.0
1990 7846 0.0 0.0 0.0
1991 8071 0.0 0.0 0.0
1992 8604 0.0 0.0 0.0
1993 8647 0.0 0.0 0.0
1994 8756 0.0 0.0 0.0
1995 8648 0.0 0.0 0.0
1996 8649 0.0 0.0 0.0
1997 8746 0.0 0.0 0.0
1998 8424 0.0 0.0 0.0
1999 8581 0.0 0.0 0.0
2000 8725 0.0 0.0 0.0
2001 8715 0.0 0.0 0.0
2002 8757 0.0 0.0 0.0
2003 8679 0.0 0.0 0.0
2004 8781 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8735 0.0 0.0 0.0
2008 8777 0.0 0.0 0.0
2009 7284 0.0 0.0 0.0
2010 7343 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8760 0.0 0.0 0.0
2014 8760 0.0 0.0 0.0
2015 8652 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8498 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References