X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154111104020

Well Details

Well ID: 0154111104020
Loading map...
Location: 02/04-11-015-11W4/0
Location Alias: 02/04-11-15-11 W4M
Location Alias 2: 02/04-11-015-11 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 11
Section: 11
County/Municipality: County of Newell
Well Name: CARDINAL ALDSON 4-11-15-11
Operator Name: Cardinal Energy Ltd.
License Number: 0187279
License Date: 1996-04-18
License Status: Issued
Spud Date: 1996-05-07
Final Drill Date: 1996-05-11
Well Total Depth: 958.00 m
Surface Hole Latitude: 50.237458
Surface Hole Longitude: -111.420177

For data sources see[1][2]

Well History

Date Event
1996-04-18 Obtained License
1996-05-08 Surface Casing Operation Performed
1996-05-11 Finished Drilling
1996-05-11 Well Log Performed
1996-05-11 Well Mode changed to Drilled and Cased
1996-05-12 Production Casing Operation Performed
1996-05-12 Rig Released
1996-06-07 Well Log Performed
1996-06-14 Well Log Performed
1996-06-15 Perforation Treatment Performed - Jet Perforation
1996-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-07 Perforation Treatment Performed - Cement Squeeze
1996-08-07 Perforation Treatment Performed - Jet Perforation
1996-08-07 Plug Back Performed
1996-08-07 Well Log Performed
1996-08-10 Perforation Treatment Performed - Jet Perforation
1996-08-10 Well Log Performed
1996-08-17 Well Began Production
1996-08-17 Well Fluid changed to Crude Oil
1996-08-17 Well Mode changed to Pumping
2000-04-25 Perforation Treatment Performed - Jet Perforation
2000-04-26 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-06-15 Perforation 923.00 924.50 20
1996-08-06 Acid Treatment 923.00 924.50 0
1996-08-07 Perforation 926.50 927.50 30
1996-08-07 Acid Treatment 923.00 927.50 0
1996-08-07 Cement Squeeze 923.00 927.50 0
1996-08-10 Perforation 923.00 924.50 20
2000-04-25 Perforation 922.50 925.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 3004 0.0 0.0 0.0
1997 8351 0.0 0.0 0.0
1998 8032 0.0 0.0 0.0
1999 7056 0.0 0.0 0.0
2000 6735 0.0 0.0 0.0
2001 6207 0.0 0.0 0.0
2002 8386 0.0 0.0 0.0
2003 7954 0.0 0.0 0.0
2004 7889 0.0 0.0 0.0
2005 8483 0.0 0.0 0.0
2006 8523 0.0 0.0 0.0
2007 8587 0.0 0.0 0.0
2008 8573 0.0 0.0 0.0
2009 8440 0.0 0.0 0.0
2010 8418 0.0 0.0 0.0
2011 8548 0.0 0.0 0.0
2012 8545 0.0 0.0 0.0
2013 8703 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8698 0.0 0.0 0.0
2016 8680 0.0 0.0 0.0
2017 8595 0.0 0.0 0.0
2018 8572 0.0 0.0 0.0
2019 8667 0.0 0.0 0.0
2020 2165 0.0 0.0 0.0

For data sources see[5]

References