X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154110213000

Well Details

Well ID: 0154110213000
Loading map...
Location: 00/13-02-015-11W4/0
Location Alias: 00/13-02-15-11 W4M
Location Alias 2: 00/13-02-015-11 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 11
Section: 02
County/Municipality: County of Newell
Well Name: TXNE 13B ALDSON 13-2-15-11
Operator Name: Torxen Energy Ltd.
License Number: 0199176
License Date: 1997-03-10
License Status: Issued
Spud Date: 1997-04-15
Final Drill Date: 1997-04-20
Well Total Depth: 1188.00 m
Surface Hole Latitude: 50.228234
Surface Hole Longitude: -111.424238

For data sources see[1][2]

Well History

Date Event
1997-03-10 Obtained License
1997-04-15 Direction Drilling Operation Performed - Deviate
1997-04-15 Well Log Performed
1997-04-16 Surface Casing Operation Performed
1997-04-19 Well Log Performed
1997-04-20 Finished Drilling
1997-04-20 Well Mode changed to Drilled and Cased
1997-04-21 Production Casing Operation Performed
1997-04-21 Rig Released
1997-05-10 Well Log Performed
1997-05-12 Perforation Treatment Performed - Jet Perforation
1997-05-12 Well Log Performed
1997-05-22 Well Log Performed
1997-06-17 Well Log Performed
1997-06-18 Perforation Treatment Performed - Jet Perforation
1997-06-18 Well Began Production
1997-06-18 Well Fluid changed to Crude Oil
1997-06-18 Well Mode changed to Flowing
1997-06-19 Well Fluid changed to Crude Oil
1997-06-19 Well Mode changed to Suspended
1998-05-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-05-07 Plug Back Performed
1998-05-09 Perforation Treatment Performed - Jet Perforation
1998-05-09 Well Log Performed
1999-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-02-21 Plug Back Performed
1999-02-21 Well Fluid changed to Crude Oil
1999-02-21 Well Mode changed to Abandoned Zone
1999-08-10 Perforation Treatment Performed - Jet Perforation
1999-08-22 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-04-15 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-05-12 Perforation 1151.50 1153.50 20
1997-06-18 Perforation 1155.30 1156.50 20
1998-05-07 Packing Device Capped w/Cement 1140.00 1148.00 0
1998-05-09 Perforation 1120.00 1123.50 14
1999-02-21 Packing Device Capped w/Cement 1110.00 1118.00 0
1999-08-10 Perforation 702.00 704.00 7
1999-08-22 Fracture 702.00 704.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 9 0.0 0.0 0.0

For data sources see[6]

References