If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0154110212002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.231561,"lon":-111.422877,"icon":""}]} |
Location: 00/12-02-015-11W4/2 | |
Location Alias: 00/12-02-15-11 W4M | |
Location Alias 2: 00/12-02-015-11 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 015 | |
Meridian: 4 | |
Range: 11 | |
Section: 02 | |
County/Municipality: County of Newell | |
Well Name: SLE ALDSON 12-2-15-11 | |
Operator Name: SanLing Energy Ltd. | |
License Number: 0023827 | |
License Date: 1963-02-15 | |
License Status: Abandoned | |
Spud Date: 1963-02-15 | |
Final Drill Date: 1963-02-19 | |
Well Total Depth: 936.70 m | |
Surface Hole Latitude: 50.231561 | |
Surface Hole Longitude: -111.422877 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1963-02-15 | Obtained License |
1963-02-19 | Finished Drilling |
1963-02-20 | Drill Stem Test Performed |
1963-02-21 | Production Casing Operation Performed |
1963-02-22 | Perforation Treatment Performed - Jet Perforation |
1991-09-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-09-12 | Perforation Treatment Performed - Jet Perforation |
1991-09-12 | Well Log Performed |
1991-09-12 | Well Mode changed to Drilled and Cased |
1995-12-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-12-21 | Perforation Treatment Performed - Jet Perforation |
1995-12-21 | Plug Back Performed |
1995-12-21 | Well Log Performed |
1996-06-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-06-16 | Plug Back Performed |
1996-06-28 | Well Abandoned |
1996-06-28 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1963-02-22 | Perforation | 919.90 | 921.10 | 13 |
1991-09-12 | Packing Device Capped w/Cement | 904.00 | 912.00 | 0 |
1991-09-12 | Perforation | 892.40 | 897.30 | 13 |
1995-12-21 | Packing Device Capped w/Cement | 872.00 | 880.00 | 0 |
1995-12-21 | Perforation | 669.30 | 671.30 | 13 |
1996-06-16 | Packing Device Capped w/Cement | 643.00 | 651.00 | 0 |
For data sources see[4]