X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154101813000

Well Details

Well ID: 0154101813000
Loading map...
Location: 00/13-18-015-10W4/0
Location Alias: 00/13-18-15-10 W4M
Location Alias 2: 00/13-18-015-10 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 10
Section: 18
County/Municipality: Cypress County
Well Name: PCI ALDERSON 13C-18-15-10
Operator Name: Suncor Energy Inc.
License Number: 0104031
License Date: 1983-11-08
License Status: RecCertified
Spud Date: 1983-12-01
Final Drill Date: 1983-12-05
Well Total Depth: 977.00 m
Surface Hole Latitude: 50.265390
Surface Hole Longitude: -111.378553

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-11-08 Obtained License
1983-12-05 Finished Drilling
1983-12-07 Production Casing Operation Performed
1983-12-07 Well Mode changed to Drilled and Cased
1984-01-21 Perforation Treatment Performed - Jet Perforation
1984-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-07-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-03 Plug Back Performed
1996-07-26 Well Log Performed
1996-08-09 Well Log Performed
1996-08-14 Perforation Treatment Performed - Jet Perforation
1996-08-14 Well Log Performed
1996-08-15 Perforation Treatment Performed - Jet Perforation
1996-08-15 Perforation Treatment Performed - Remedial Casing
1996-08-15 Well Log Performed
1996-09-12 Perforation Treatment Performed - Jet Perforation
1996-09-12 Well Log Performed
1996-09-13 Perforation Treatment Performed - Remedial Casing
1997-08-13 Well Fluid changed to Crude Oil
1997-08-13 Well Mode changed to Potential
1997-08-14 Well Abandoned
1997-08-14 Well Fluid changed to Crude Oil
1997-08-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-01-21 Perforation 949.00 950.00 0
1996-09-13 Remedial Casing Cementing 167.00 178.00 0
1984-01-23 Acid Treatment 949.00 950.00 0
1996-07-03 Packing Device Capped w/Cement 929.00 937.00 0
1996-08-14 Perforation 255.00 256.00 13
1996-08-14 Perforation 237.50 238.50 13
1996-08-15 Perforation 248.00 249.00 13
1996-08-15 Remedial Casing Cementing 237.50 256.00 0
1996-09-12 Perforation 167.00 168.00 13
1996-09-12 Perforation 177.00 178.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 0 0.0 0.0 0.0

For data sources see[5]

References