X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154101408000

Well Details

Well ID: 0154101408000
Loading map...
Location: 00/08-14-015-10W4/0
Location Alias: 00/08-14-15-10 W4M
Location Alias 2: 00/08-14-015-10 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 10
Section: 14
County/Municipality: Cypress County
Well Name: SLE ALDSON 8-14-15-10
Operator Name: SanLing Energy Ltd.
License Number: 0137050
License Date: 1988-10-19
License Status: Abandoned
Spud Date: 1988-10-20
Final Drill Date: 1988-10-24
Well Total Depth: 970.00 m
Surface Hole Latitude: 50.258750
Surface Hole Longitude: -111.270323

For data sources see[1][2]

Well History

Date Event
1988-10-19 Obtained License
1988-10-21 Surface Casing Operation Performed
1988-10-22 Kick Occurred
1988-10-24 Drill Stem Test Performed
1988-10-24 Finished Drilling
1988-10-24 Well Log Performed
1988-10-25 Drill Stem Test Performed
1988-10-26 Production Casing Operation Performed
1988-10-26 Rig Released
1989-10-05 Perforation Treatment Performed - Jet Perforation
1989-10-05 Well Mode changed to Drilled and Cased
2000-06-01 Well Fluid changed to Gas
2000-06-01 Well Mode changed to Testing
2004-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-06-08 Plug Back Performed
2004-06-08 Well Fluid changed to Gas
2004-06-08 Well Log Performed
2004-06-08 Well Mode changed to Abandoned Zone
2004-06-09 Well Log Performed
2004-06-14 Perforation Treatment Performed - Abrasa-Jet Perforation
2004-06-16 Perforation Treatment Performed - Remedial Casing
2004-06-17 Perforation Treatment Performed - Abrasa-Jet Perforation
2004-06-18 Perforation Treatment Performed - Remedial Casing
2004-07-15 Well Abandoned
2004-07-15 Well Fluid changed to Gas
2004-07-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-10-05 Perforation 710.50 713.00 13
2004-06-08 Packing Device Capped w/Cement 692.00 700.00 0
2004-06-14 Hydra Jet Perforation 574.00 581.00 1
2004-06-16 Remedial Casing Cementing 574.00 581.00 0
2004-06-17 Hydra Jet Perforation 253.00 258.00 1
2004-06-18 Remedial Casing Cementing 253.00 258.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 28 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-10-22 Kick 850.00 850.00

For data sources see[6]

References