If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0154091106043 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.249519,"lon":-111.138048,"icon":""}]} |
Location: 04/06-11-015-09W4/3 | |
Location Alias: 04/06-11-15-09 W4M | |
Location Alias 2: 04/06-11-015-09 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 015 | |
Meridian: 4 | |
Range: 09 | |
Section: 11 | |
County/Municipality: Cypress County | |
Well Name: HARVEST 15D-11 ALDSON 6-11-15-9 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0342592 | |
License Date: 2005-11-14 | |
License Status: Amended | |
Spud Date: 2005-11-17 | |
Final Drill Date: 2005-12-03 | |
Well Total Depth: 1623.00 m | |
Surface Hole Latitude: 50.249519 | |
Surface Hole Longitude: -111.138048 |
Date | Event |
---|---|
2005-11-14 | Obtained License |
2005-11-18 | Surface Casing Operation Performed |
2005-11-20 | Direction Drilling Operation Performed - Horizontal |
2005-11-27 | Direction Drilling Operation Performed - Deviate |
2005-11-29 | Well Log Performed |
2005-11-30 | Intermediate Casing Operation Performed |
2005-12-01 | Well Log Performed |
2005-12-03 | Direction Drilling Operation Performed - Horizontal |
2005-12-03 | Finished Drilling |
2005-12-03 | Well Log Performed |
2005-12-03 | Well Structure changed to Drain |
2005-12-04 | Liner Casing Operation Performed |
2005-12-04 | Perforation Treatment Performed - Open-Hole Completion |
2005-12-04 | Perforation Treatment Performed - Slotted Liner or Casing |
2005-12-04 | Rig Released |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2005-11-20 | 739.00 | Horizontal |
2005-11-27 | 760.00 | Deviate (5 - 79 degrees) |
2005-12-03 | 1360.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-12-04 | Slotted Liner | 1332.00 | 1591.10 | 0 |
2005-12-04 | Open Hole/Barefoot Completion | 1591.10 | 1623.00 | 0 |
For data sources see[5]