If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0154082116050 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.283163,"lon":-111.031409,"icon":""}]} |
Location: 05/16-21-015-08W4/0 | |
Location Alias: 05/16-21-15-08 W4M | |
Location Alias 2: 05/16-21-015-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 015 | |
Meridian: 4 | |
Range: 08 | |
Section: 21 | |
County/Municipality: Cypress County | |
Well Name: HARVEST 4F-27 SUFFIELD 16-21-15-8 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0431449 | |
License Date: 2011-02-11 | |
License Status: Issued | |
Spud Date: 2011-03-04 | |
Final Drill Date: 2011-03-10 | |
Well Total Depth: 1481.00 m | |
Surface Hole Latitude: 50.283163 | |
Surface Hole Longitude: -111.031409 |
Date | Event |
---|---|
2011-02-11 | Obtained License |
2011-03-05 | Surface Casing Operation Performed |
2011-03-06 | Well Log Performed |
2011-03-07 | Direction Drilling Operation Performed - Horizontal |
2011-03-09 | Intermediate Casing Operation Performed |
2011-03-10 | Finished Drilling |
2011-03-10 | Well Log Performed |
2011-03-10 | Well Mode changed to Drilled and Cased |
2011-03-11 | Liner Casing Operation Performed |
2011-03-11 | Perforation Treatment Performed - Open-Hole Completion |
2011-03-11 | Perforation Treatment Performed - Slotted Liner or Casing |
2011-03-11 | Rig Released |
2011-10-15 | Well Log Performed |
2011-10-18 | Well Log Performed |
2013-02-12 | Well Began Injection |
2013-02-12 | Well Fluid changed to Water |
2013-02-12 | Well Type changed to Injection |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-03-07 | 700.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-03-11 | Open Hole/Barefoot Completion | 1424.00 | 1481.00 | 0 |
2011-03-11 | Slotted Liner | 1129.00 | 1424.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]