X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154050209000

Well Details

Well ID: 0154050209000
Loading map...
Location: 00/09-02-015-05W4/0
Location Alias: 00/09-02-15-05 W4M
Location Alias 2: 00/09-02-015-05 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 05
Section: 02
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 9-2-15-5
Operator Name: Canlin Energy Corporation
License Number: 0408114
License Date: 2009-01-19
License Status: Issued
Spud Date: 2009-01-24
Final Drill Date: 2009-01-25
Well Total Depth: 562.00 m
Surface Hole Latitude: 50.232420
Surface Hole Longitude: -110.585214

For data sources see[1][2]

Well History

Date Event
2009-01-19 Obtained License
2009-01-24 Direction Drilling Operation Performed - Deviate
2009-01-24 Surface Casing Operation Performed
2009-01-25 Direction Drilling Operation Performed - Deviate
2009-01-25 Finished Drilling
2009-01-25 Production Casing Operation Performed
2009-01-25 Rig Released
2009-01-25 Well Mode changed to Drilled and Cased
2009-01-27 Well Log Performed
2009-01-29 Perforation Treatment Performed - Jet Perforation
2009-02-05 Perforation Treatment Performed - Fractured
2009-03-11 Well Began Production
2009-03-11 Well Fluid changed to Gas
2009-03-11 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-01-24 5.70 Deviate (5 - 79 degrees)
2009-01-25 185.60 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-01-29 Perforation 506.00 510.00 7
2009-02-05 Fracture 375.00 379.00 0
2009-02-05 Fracture 355.00 359.00 0
2009-02-05 Fracture 339.00 343.00 0
2009-01-29 Perforation 428.00 432.00 7
2009-01-29 Perforation 412.00 416.00 7
2009-01-29 Perforation 375.00 379.00 7
2009-01-29 Perforation 355.00 359.00 7
2009-01-29 Perforation 339.00 343.00 7
2009-02-05 Fracture 506.00 510.00 0
2009-02-05 Fracture 428.00 432.00 0
2009-02-05 Fracture 412.00 416.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 6618 0.0 0.0 0.0
2010 8442 0.0 0.0 0.0
2011 8466 0.0 0.0 0.0
2012 8760 0.0 0.0 0.0
2013 8733 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8099 0.0 0.0 0.0
2019 8508 0.0 0.0 0.0
2020 2057 0.0 0.0 0.0

For data sources see[6]

References