X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154033006032

Well Details

Well ID: 0154033006032
Loading map...
Location: 03/06-30-015-03W4/2
Location Alias: 03/06-30-15-03 W4M
Location Alias 2: 03/06-30-015-03 W4/02
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 03
Section: 30
County/Municipality: Cypress County
Well Name: GASCAN MEDHAT 6-30-15-3
Operator Name: TAQA North Ltd.
License Number: 0071786
License Date: 1978-09-06
License Status: Issued
Spud Date: 1978-09-27
Final Drill Date: 1978-09-29
Well Total Depth: 808.00 m
Surface Hole Latitude: 50.286261
Surface Hole Longitude: -110.409648

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-09-06 Obtained License
1978-09-29 Finished Drilling
1978-09-29 Production Casing Operation Performed
1978-09-29 Well Mode changed to Drilled and Cased
1978-10-11 Perforation Treatment Performed - Bullet Perforation
1978-10-11 Perforation Treatment Performed - Selective Bullet Perforations
1978-10-28 Perforation Treatment Performed - Selective Bullet Perforations
1978-11-29 Perforation Treatment Performed - Fractured
1979-10-09 Perforation Treatment Performed - Selective Bullet Perforations
1979-12-04 Well Began Production
1979-12-04 Well Fluid changed to Gas
1979-12-04 Well Mode changed to Flowing
1980-07-21 Perforation Treatment Performed - Fractured
1987-04-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-04-30 Plug Back Performed
2003-08-11 Well Log Performed
2003-08-12 Perforation Treatment Performed - Jet Perforation
2003-08-18 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-10-11 Selective Bullet Perforations 685.50 690.00 0
1978-10-11 Selective Bullet Perforations 723.00 725.00 0
1978-10-11 Selective Bullet Perforations 726.00 727.00 0
1978-10-11 Selective Bullet Perforations 728.00 729.00 0
1978-10-11 Selective Bullet Perforations 730.00 731.80 0
1978-10-11 Selective Bullet Perforations 733.00 734.00 0
1978-10-11 Selective Bullet Perforations 734.50 734.70 0
1978-10-11 Selective Bullet Perforations 734.80 734.90 0
1978-10-11 Selective Bullet Perforations 735.00 735.10 0
1978-10-11 Selective Bullet Perforations 735.20 735.20 0
1978-10-11 Selective Bullet Perforations 735.30 735.40 0
1978-10-11 Selective Bullet Perforations 694.00 696.80 0
1978-10-11 Selective Bullet Perforations 735.50 736.80 0
1978-10-11 Bullet Perforation 735.60 736.70 14
1978-10-11 Selective Bullet Perforations 736.80 736.90 0
1978-10-11 Selective Bullet Perforations 737.00 737.00 0
1978-10-28 Selective Bullet Perforations 487.00 487.50 0
1978-10-28 Selective Bullet Perforations 488.00 488.50 0
1978-10-28 Selective Bullet Perforations 489.00 489.50 0
1978-10-28 Selective Bullet Perforations 490.00 490.50 0
1978-10-28 Selective Bullet Perforations 491.00 491.50 0
1978-10-28 Selective Bullet Perforations 492.00 493.00 0
1978-10-11 Selective Bullet Perforations 700.00 701.20 0
1978-10-28 Selective Bullet Perforations 494.00 495.00 0
1978-10-28 Selective Bullet Perforations 496.00 497.00 0
1978-10-28 Selective Bullet Perforations 498.00 499.50 0
1978-10-28 Selective Bullet Perforations 501.00 503.00 0
1978-10-28 Selective Bullet Perforations 507.00 510.00 0
1978-10-28 Selective Bullet Perforations 513.00 518.00 0
1978-11-29 Fracture 487.00 518.50 0
1979-10-09 Selective Bullet Perforations 467.50 468.00 0
1979-10-09 Selective Bullet Perforations 468.50 469.00 0
1979-10-09 Selective Bullet Perforations 469.50 470.00 0
1978-10-11 Selective Bullet Perforations 703.80 705.50 0
1979-10-09 Selective Bullet Perforations 470.50 471.00 0
1979-10-09 Selective Bullet Perforations 472.00 473.00 0
1979-10-09 Selective Bullet Perforations 473.50 474.00 0
1979-10-09 Selective Bullet Perforations 474.50 475.00 0
1979-10-09 Selective Bullet Perforations 476.00 477.00 0
1979-10-09 Selective Bullet Perforations 479.00 480.00 0
1980-07-21 Fracture 467.50 480.00 0
1987-04-30 Packing Device Capped w/Cement 657.00 665.00 0
2003-08-12 Perforation 458.50 461.50 13
2003-08-12 Perforation 455.50 458.50 13
1978-10-11 Selective Bullet Perforations 706.50 708.00 0
2003-08-18 Fracture 455.50 461.50 0
1978-10-11 Selective Bullet Perforations 709.00 711.80 0
1978-10-11 Selective Bullet Perforations 712.80 716.00 0
1978-10-11 Selective Bullet Perforations 717.20 718.80 0
1978-10-11 Selective Bullet Perforations 720.00 722.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 662 0.0 0.0 0.0
1980 5711 0.0 0.0 0.0
1981 8636 0.0 0.0 0.0
1982 6949 0.0 0.0 0.0
1983 3840 0.0 0.0 0.0
1984 7416 0.0 0.0 0.0
1985 6439 0.0 0.0 0.0
1986 6755 0.0 0.0 0.0
1987 7071 0.0 0.0 0.0
1988 8307 0.0 0.0 0.0
1989 8366 0.0 0.0 0.0
1990 8721 0.0 0.0 0.0
1991 8084 0.0 0.0 0.0
1992 8771 0.0 0.0 0.0
1993 8753 0.0 0.0 0.0
1994 8758 0.0 0.0 0.0
1995 8754 0.0 0.0 0.0
1996 8782 0.0 0.0 0.0
1997 8736 0.0 0.0 0.0
1998 8750 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8570 0.0 0.0 0.0
2006 8538 0.0 0.0 0.0
2007 8596 0.0 0.0 0.0
2008 8586 0.0 0.0 0.0
2009 8700 0.0 0.0 0.0
2010 8725 0.0 0.0 0.0
2011 8281 0.0 0.0 0.0
2012 8712 0.0 0.0 0.0
2013 8662 0.0 0.0 0.0
2014 8610 0.0 0.0 0.0
2015 7966 0.0 0.0 0.0
2016 8685 0.0 0.0 0.0
2017 8673 0.0 0.0 0.0
2018 8675 0.0 0.0 0.0
2019 8495 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References