X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154033006030

Well Details

Well ID: 0154033006030
Loading map...
Location: 03/06-30-015-03W4/0
Location Alias: 03/06-30-15-03 W4M
Location Alias 2: 03/06-30-015-03 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 03
Section: 30
County/Municipality: Cypress County
Well Name: GASCAN MEDHAT 6-30-15-3
Operator Name: TAQA North Ltd.
License Number: 0071786
License Date: 1978-09-06
License Status: Issued
Spud Date: 1978-09-27
Final Drill Date: 1978-09-29
Well Total Depth: 808.00 m
Surface Hole Latitude: 50.286261
Surface Hole Longitude: -110.409648

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-09-06 Obtained License
1978-09-29 Finished Drilling
1978-09-29 Production Casing Operation Performed
1978-09-30 Well Mode changed to Drilled and Cased
1978-10-11 Perforation Treatment Performed - Bullet Perforation
1978-10-11 Perforation Treatment Performed - Selective Bullet Perforations
1978-10-28 Perforation Treatment Performed - Selective Bullet Perforations
1978-10-28 Well Mode changed to Drilled and Cased
1978-11-29 Perforation Treatment Performed - Fractured
1979-10-09 Perforation Treatment Performed - Selective Bullet Perforations
1979-12-05 Well Began Production
1979-12-05 Well Fluid changed to Gas
1979-12-05 Well Mode changed to Flowing
1980-07-21 Perforation Treatment Performed - Fractured
1987-04-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-04-30 Plug Back Performed
1987-04-30 Well Fluid changed to Gas
1987-04-30 Well Mode changed to Abandoned Zone
2003-08-11 Well Log Performed
2003-08-12 Perforation Treatment Performed - Jet Perforation
2003-08-18 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-10-11 Selective Bullet Perforations 685.50 690.00 0
1978-10-11 Selective Bullet Perforations 723.00 725.00 0
1978-10-11 Selective Bullet Perforations 726.00 727.00 0
1978-10-11 Selective Bullet Perforations 728.00 729.00 0
1978-10-11 Selective Bullet Perforations 730.00 731.80 0
1978-10-11 Selective Bullet Perforations 733.00 734.00 0
1978-10-11 Selective Bullet Perforations 734.50 734.70 0
1978-10-11 Selective Bullet Perforations 734.80 734.90 0
1978-10-11 Selective Bullet Perforations 735.00 735.10 0
1978-10-11 Selective Bullet Perforations 735.20 735.20 0
1978-10-11 Selective Bullet Perforations 735.30 735.40 0
1978-10-11 Selective Bullet Perforations 694.00 696.80 0
1978-10-11 Selective Bullet Perforations 735.50 736.80 0
1978-10-11 Bullet Perforation 735.60 736.70 14
1978-10-11 Selective Bullet Perforations 736.80 736.90 0
1978-10-11 Selective Bullet Perforations 737.00 737.00 0
1978-10-28 Selective Bullet Perforations 487.00 487.50 0
1978-10-28 Selective Bullet Perforations 488.00 488.50 0
1978-10-28 Selective Bullet Perforations 489.00 489.50 0
1978-10-28 Selective Bullet Perforations 490.00 490.50 0
1978-10-28 Selective Bullet Perforations 491.00 491.50 0
1978-10-28 Selective Bullet Perforations 492.00 493.00 0
1978-10-11 Selective Bullet Perforations 700.00 701.20 0
1978-10-28 Selective Bullet Perforations 494.00 495.00 0
1978-10-28 Selective Bullet Perforations 496.00 497.00 0
1978-10-28 Selective Bullet Perforations 498.00 499.50 0
1978-10-28 Selective Bullet Perforations 501.00 503.00 0
1978-10-28 Selective Bullet Perforations 507.00 510.00 0
1978-10-28 Selective Bullet Perforations 513.00 518.00 0
1978-11-29 Fracture 487.00 518.50 0
1979-10-09 Selective Bullet Perforations 467.50 468.00 0
1979-10-09 Selective Bullet Perforations 468.50 469.00 0
1979-10-09 Selective Bullet Perforations 469.50 470.00 0
1978-10-11 Selective Bullet Perforations 703.80 705.50 0
1979-10-09 Selective Bullet Perforations 470.50 471.00 0
1979-10-09 Selective Bullet Perforations 472.00 473.00 0
1979-10-09 Selective Bullet Perforations 473.50 474.00 0
1979-10-09 Selective Bullet Perforations 474.50 475.00 0
1979-10-09 Selective Bullet Perforations 476.00 477.00 0
1979-10-09 Selective Bullet Perforations 479.00 480.00 0
1980-07-21 Fracture 467.50 480.00 0
1987-04-30 Packing Device Capped w/Cement 657.00 665.00 0
2003-08-12 Perforation 458.50 461.50 13
2003-08-12 Perforation 455.50 458.50 13
1978-10-11 Selective Bullet Perforations 706.50 708.00 0
2003-08-18 Fracture 455.50 461.50 0
1978-10-11 Selective Bullet Perforations 709.00 711.80 0
1978-10-11 Selective Bullet Perforations 712.80 716.00 0
1978-10-11 Selective Bullet Perforations 717.20 718.80 0
1978-10-11 Selective Bullet Perforations 720.00 722.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 645 0.0 0.0 0.0
1980 7349 0.0 0.0 0.0
1981 7141 0.0 0.0 0.0
1982 6372 0.0 0.0 0.0
1983 1867 0.0 0.0 0.0
1984 7425 0.0 0.0 0.0
1985 6484 0.0 0.0 0.0
1986 6756 0.0 0.0 0.0
1987 2063 0.0 0.0 0.0

For data sources see[5]

References