X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154031906000

Well Details

Well ID: 0154031906000
Loading map...
Location: 00/06-19-015-03W4/0
Location Alias: 00/06-19-15-03 W4M
Location Alias 2: 00/06-19-015-03 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 03
Section: 19
County/Municipality: Cypress County
Well Name: GASCAN MEDICINE HAT 6-19-15-3
Operator Name: TAQA North Ltd.
License Number: 0065148
License Date: 1977-08-05
License Status: Issued
Spud Date: 1977-08-09
Final Drill Date: 1977-08-14
Well Total Depth: 1005.80 m
Surface Hole Latitude: 50.271333
Surface Hole Longitude: -110.410642

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-08-05 Obtained License
1977-08-14 Finished Drilling
1977-08-14 Well Mode changed to Drilled and Cased
1977-08-17 Drill Stem Test Performed
1977-08-18 Drill Stem Test Performed
1977-08-19 Production Casing Operation Performed
1977-08-30 Perforation Treatment Performed - Bullet Perforation
1977-08-30 Perforation Treatment Performed - Selective Bullet Perforations
1977-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-12 Perforation Treatment Performed - Cement Squeeze
1978-10-30 Perforation Treatment Performed - Cement Squeeze
1979-07-07 Perforation Treatment Performed - Selective Bullet Perforations
1979-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-08-10 Perforation Treatment Performed - Fractured
1979-10-09 Perforation Treatment Performed - Selective Bullet Perforations
1979-12-04 Well Began Production
1979-12-04 Well Fluid changed to Gas
1979-12-04 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-08-30 Selective Bullet Perforations 758.30 760.50 0
1978-06-12 Cement Squeeze 766.90 770.20 0
1978-10-30 Cement Squeeze 758.30 766.30 0
1979-07-07 Selective Bullet Perforations 647.70 648.30 0
1979-07-07 Selective Bullet Perforations 648.90 650.70 0
1979-07-07 Selective Bullet Perforations 651.40 652.30 0
1979-07-07 Selective Bullet Perforations 652.90 653.50 0
1979-07-07 Selective Bullet Perforations 654.10 657.10 0
1979-07-07 Selective Bullet Perforations 659.00 660.80 0
1979-07-07 Selective Bullet Perforations 661.40 665.10 0
1979-07-07 Selective Bullet Perforations 668.70 670.60 0
1977-08-30 Selective Bullet Perforations 710.10 762.30 0
1979-07-07 Selective Bullet Perforations 674.20 674.20 0
1979-07-07 Selective Bullet Perforations 515.40 516.00 0
1979-07-07 Selective Bullet Perforations 516.60 517.20 0
1979-07-07 Selective Bullet Perforations 517.90 518.50 0
1979-07-07 Selective Bullet Perforations 519.10 519.70 0
1979-07-07 Selective Bullet Perforations 520.30 520.90 0
1979-07-07 Selective Bullet Perforations 523.00 523.60 0
1979-07-07 Selective Bullet Perforations 524.90 526.10 0
1979-07-07 Selective Bullet Perforations 527.30 527.90 0
1979-07-07 Selective Bullet Perforations 528.50 537.10 0
1977-08-30 Selective Bullet Perforations 762.60 763.70 0
1979-07-07 Selective Bullet Perforations 537.10 538.00 0
1979-07-07 Selective Bullet Perforations 547.10 549.10 0
1979-08-07 Packing Device Capped w/Cement 624.50 632.50 0
1979-08-10 Fracture 515.40 549.10 0
1979-10-09 Selective Bullet Perforations 495.60 496.20 0
1979-10-09 Selective Bullet Perforations 496.80 497.40 0
1979-10-09 Selective Bullet Perforations 498.00 498.70 0
1979-10-09 Selective Bullet Perforations 499.30 499.90 0
1979-10-09 Selective Bullet Perforations 500.50 501.10 0
1979-10-09 Selective Bullet Perforations 502.30 502.90 0
1977-08-30 Selective Bullet Perforations 763.80 764.40 0
1979-10-09 Selective Bullet Perforations 503.50 504.40 0
1979-10-09 Selective Bullet Perforations 504.70 506.00 0
1979-10-09 Selective Bullet Perforations 507.20 508.40 0
1979-10-09 Selective Bullet Perforations 509.60 509.60 0
1977-08-30 Selective Bullet Perforations 765.00 765.70 0
1977-08-30 Selective Bullet Perforations 766.30 766.90 0
1977-08-30 Selective Bullet Perforations 767.50 768.70 0
1977-08-30 Bullet Perforation 769.00 770.20 3
1977-09-01 Acid Treatment 758.30 770.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 662 0.0 0.0 0.0
1980 7397 0.0 0.0 0.0
1981 7271 0.0 0.0 0.0
1982 8042 0.0 0.0 0.0
1983 5017 0.0 0.0 0.0
1984 7425 0.0 0.0 0.0
1985 7156 0.0 0.0 0.0
1986 6741 0.0 0.0 0.0
1987 7507 0.0 0.0 0.0
1988 8312 0.0 0.0 0.0
1989 7624 0.0 0.0 0.0
1990 8755 0.0 0.0 0.0
1991 8754 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8758 0.0 0.0 0.0
1995 8754 0.0 0.0 0.0
1996 8782 0.0 0.0 0.0
1997 8736 0.0 0.0 0.0
1998 8750 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8570 0.0 0.0 0.0
2006 8538 0.0 0.0 0.0
2007 8596 0.0 0.0 0.0
2008 8586 0.0 0.0 0.0
2009 8700 0.0 0.0 0.0
2010 8725 0.0 0.0 0.0
2011 8641 0.0 0.0 0.0
2012 8712 0.0 0.0 0.0
2013 8662 0.0 0.0 0.0
2014 8610 0.0 0.0 0.0
2015 7966 0.0 0.0 0.0
2016 8685 0.0 0.0 0.0
2017 8673 0.0 0.0 0.0
2018 8627 0.0 0.0 0.0
2019 8495 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References