If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0154020314000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.234285,"lon":-110.20488,"icon":""}]} |
Location: 00/14-03-015-02W4/0 | |
Location Alias: 00/14-03-15-02 W4M | |
Location Alias 2: 00/14-03-015-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 015 | |
Meridian: 4 | |
Range: 02 | |
Section: 03 | |
County/Municipality: Cypress County | |
Well Name: Canlin MEDHAT 14-3-15-2 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0078029 | |
License Date: 1979-09-14 | |
License Status: Issued | |
Spud Date: 1979-09-29 | |
Final Drill Date: 1979-09-30 | |
Well Total Depth: 538.00 m | |
Surface Hole Latitude: 50.234285 | |
Surface Hole Longitude: -110.204880 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-09-14 | Obtained License |
1979-09-30 | Finished Drilling |
1979-09-30 | Well Mode changed to Drilled and Cased |
1979-10-01 | Production Casing Operation Performed |
1979-10-10 | Perforation Treatment Performed - Jet Perforation |
1979-10-12 | Perforation Treatment Performed - Fractured |
1979-10-16 | Perforation Treatment Performed - Jet Perforation |
1979-10-27 | Perforation Treatment Performed - Fractured |
1979-11-06 | Perforation Treatment Performed - Jet Perforation |
1979-12-12 | Well Began Production |
1979-12-12 | Well Fluid changed to Gas |
1979-12-12 | Well Mode changed to Flowing |
1986-04-18 | Well Fluid changed to Gas |
1986-04-18 | Well Mode changed to Suspended |
1988-09-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-09-08 | Plug Back Performed |
1988-09-08 | Well Fluid changed to Gas |
1988-09-08 | Well Mode changed to Abandoned Zone |
1988-09-09 | Perforation Treatment Performed - Jet Perforation |
1988-09-09 | Well Log Performed |
1988-09-12 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-10-10 | Perforation | 508.00 | 510.00 | 9 |
1979-10-12 | Fracture | 508.00 | 510.00 | 0 |
1979-10-16 | Perforation | 486.00 | 488.00 | 9 |
1979-10-27 | Fracture | 486.00 | 488.00 | 0 |
1979-11-06 | Perforation | 181.00 | 182.00 | 6 |
1988-09-08 | Packing Device Capped w/Cement | 482.00 | 484.00 | 0 |
1988-09-09 | Perforation | 473.00 | 479.00 | 13 |
1988-09-12 | Fracture | 473.00 | 479.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 472 | 0.0 | 0.0 | 0.0 |
1980 | 7618 | 0.0 | 0.0 | 0.0 |
1981 | 8253 | 0.0 | 0.0 | 0.0 |
1982 | 7029 | 0.0 | 0.0 | 0.0 |
1983 | 3421 | 0.0 | 0.0 | 0.0 |
1984 | 2201 | 0.0 | 0.0 | 0.0 |
For data sources see[5]