X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154011206022

Well Details

Well ID: 0154011206022
Loading map...
Location: 02/06-12-015-01W4/2
Location Alias: 02/06-12-15-01 W4M
Location Alias 2: 02/06-12-015-01 W4/02
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 01
Section: 12
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 6-12-15-1
Operator Name: Canlin Energy Corporation
License Number: 0059010
License Date: 1976-07-06
License Status: Suspension
Spud Date: 1976-07-17
Final Drill Date: 1976-07-19
Well Total Depth: 733.30 m
Surface Hole Latitude: 50.240825
Surface Hole Longitude: -110.021520

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-07-06 Obtained License
1976-07-19 Finished Drilling
1976-07-19 Production Casing Operation Performed
1976-07-19 Well Mode changed to Drilled and Cased
1976-07-21 Perforation Treatment Performed - Bullet Perforation
1976-07-22 Perforation Treatment Performed - Fractured
1976-07-24 Perforation Treatment Performed - Bullet Perforation
1976-07-24 Perforation Treatment Performed - Selective Bullet Perforations
1976-07-26 Perforation Treatment Performed - Fractured
1976-08-19 Well Began Production
1976-08-19 Well Fluid changed to Gas
1976-08-19 Well Mode changed to Flowing
2009-11-01 Well Fluid changed to Gas
2009-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-07-21 Bullet Perforation 718.40 719.30 13
1976-07-24 Selective Bullet Perforations 485.90 487.10 0
1976-07-26 Fracture 452.30 487.10 0
1976-07-21 Bullet Perforation 721.50 722.40 7
1976-07-22 Fracture 718.40 722.40 0
1976-07-24 Selective Bullet Perforations 452.30 452.90 0
1976-07-24 Selective Bullet Perforations 473.70 474.30 0
1976-07-24 Bullet Perforation 479.50 479.80 3
1976-07-24 Bullet Perforation 481.60 482.20 7
1976-07-24 Bullet Perforation 482.50 483.70 3
1976-07-24 Bullet Perforation 485.50 485.90 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 3072 0.0 0.0 0.0
1977 8644 0.0 0.0 0.0
1978 8043 0.0 0.0 0.0
1979 7726 0.0 0.0 0.0
1980 8554 0.0 0.0 0.0
1981 7115 0.0 0.0 0.0
1982 7301 0.0 0.0 0.0
1983 7863 0.0 0.0 0.0
1984 8450 0.0 0.0 0.0
1985 8570 0.0 0.0 0.0
1986 8714 0.0 0.0 0.0
1987 6976 0.0 0.0 0.0
1988 2920 0.0 0.0 0.0
1989 8741 0.0 0.0 0.0
1990 6527 0.0 0.0 0.0
1991 7835 0.0 0.0 0.0
1992 8736 0.0 0.0 0.0
1993 8318 0.0 0.0 0.0
1994 8520 0.0 0.0 0.0
1995 8596 0.0 0.0 0.0
1996 8732 0.0 0.0 0.0
1997 8401 0.0 0.0 0.0
1998 8642 0.0 0.0 0.0
1999 8708 0.0 0.0 0.0
2000 8751 0.0 0.0 0.0
2001 8724 0.0 0.0 0.0
2002 6540 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8735 0.0 0.0 0.0
2005 8225 0.0 0.0 0.0
2006 8373 0.0 0.0 0.0
2007 7813 0.0 0.0 0.0

For data sources see[5]

References