X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154010101000

Well Details

Well ID: 0154010101000
Loading map...
Location: 00/01-01-015-01W4/0
Location Alias: 00/01-01-15-01 W4M
Location Alias 2: 00/01-01-015-01 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 01
Section: 01
County/Municipality: Cypress County
Well Name: PINE CLIFF MEDHAT 1-1-15-1
Operator Name: Pine Cliff Energy Ltd.
License Number: 0049763
License Date: 1974-05-14
License Status: Suspension
Spud Date: 1974-06-22
Final Drill Date: 1974-06-24
Well Total Depth: 493.80 m
Surface Hole Latitude: 50.225182
Surface Hole Longitude: -110.008183

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-05-14 Obtained License
1974-06-24 Finished Drilling
1974-06-24 Production Casing Operation Performed
1974-06-24 Well Mode changed to Drilled and Cased
1974-07-20 Perforation Treatment Performed - Selective Jet Perforations
1974-07-23 Perforation Treatment Performed - Fractured
1975-01-31 Well Began Production
1975-01-31 Well Fluid changed to Gas
1975-01-31 Well Mode changed to Flowing
1998-04-14 Well Log Performed
2007-04-01 Well Fluid changed to Gas
2007-04-01 Well Mode changed to Suspended
2017-10-26 Well Fluid changed to Gas
2017-10-26 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-07-20 Selective Jet Perforations 431.60 432.20 0
1974-07-23 Fracture 431.60 467.30 0
1974-07-20 Selective Jet Perforations 432.80 452.90 0
1974-07-20 Selective Jet Perforations 453.50 454.80 0
1974-07-20 Selective Jet Perforations 458.40 459.00 0
1974-07-20 Selective Jet Perforations 459.60 460.60 0
1974-07-20 Selective Jet Perforations 461.50 462.10 0
1974-07-20 Selective Jet Perforations 462.70 463.30 0
1974-07-20 Selective Jet Perforations 463.90 464.80 0
1974-07-20 Selective Jet Perforations 466.60 467.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 7894 0.0 0.0 0.0
1976 8783 0.0 0.0 0.0
1977 8303 0.0 0.0 0.0
1978 7847 0.0 0.0 0.0
1979 7671 0.0 0.0 0.0
1980 7856 0.0 0.0 0.0
1981 6362 0.0 0.0 0.0
1982 5205 0.0 0.0 0.0
1983 8353 0.0 0.0 0.0
1984 7932 0.0 0.0 0.0
1985 6973 0.0 0.0 0.0
1986 4706 0.0 0.0 0.0
1987 5230 0.0 0.0 0.0
1988 7243 0.0 0.0 0.0
1989 7466 0.0 0.0 0.0
1990 4699 0.0 0.0 0.0
1991 8015 0.0 0.0 0.0
1992 8741 0.0 0.0 0.0
1993 8015 0.0 0.0 0.0
1994 8015 0.0 0.0 0.0
1995 8663 0.0 0.0 0.0
1996 8773 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8015 0.0 0.0 0.0
2000 744 0.0 0.0 0.0
2001 6551 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 7583 0.0 0.0 0.0
2017 1608 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References