If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0144202311002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.189541,"lon":-112.636218,"icon":""}]} |
Location: 00/11-23-014-20W4/2 | |
Location Alias: 00/11-23-14-20 W4M | |
Location Alias 2: 00/11-23-014-20 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 014 | |
Meridian: 4 | |
Range: 20 | |
Section: 23 | |
County/Municipality: Municipal District of Taber | |
Well Name: AMOCO LBOW 11-23-14-20 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0047416 | |
License Date: 1973-09-27 | |
License Status: RecCertified | |
Spud Date: 1973-09-29 | |
Final Drill Date: 1973-10-03 | |
Well Total Depth: 1249.70 m | |
Surface Hole Latitude: 50.189541 | |
Surface Hole Longitude: -112.636218 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1973-09-27 | Obtained License |
1973-10-03 | Finished Drilling |
1973-10-03 | Well Mode changed to Drilled and Cased |
1973-10-04 | Drill Stem Test Performed |
1973-10-05 | Production Casing Operation Performed |
1973-10-11 | Perforation Treatment Performed - Jet Perforation |
1973-10-16 | Perforation Treatment Performed - Jet Perforation |
1973-10-17 | Perforation Treatment Performed - Cement Squeeze |
1973-10-19 | Perforation Treatment Performed - Jet Perforation |
1973-10-19 | Perforation Treatment Performed - Selective Jet Perforations |
1973-10-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-10-23 | Perforation Treatment Performed - Cement Squeeze |
1973-11-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1974-07-05 | Perforation Treatment Performed - Jet Perforation |
1974-07-21 | Perforation Treatment Performed - Jet Perforation |
1981-12-16 | Well Began Production |
1981-12-16 | Well Fluid changed to Gas |
1981-12-16 | Well Mode changed to Flowing |
1982-09-20 | Perforation Treatment Performed - Jet Perforation |
1982-09-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-09-29 | Perforation Treatment Performed - Chemical Squeeze |
1984-02-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-01-01 | Well Fluid changed to Gas |
1986-01-01 | Well Mode changed to Suspended |
1988-11-01 | Well Fluid changed to Gas |
1988-11-01 | Well Mode changed to Flowing |
1989-05-18 | Perforation Treatment Performed - Jet Perforation |
1993-05-29 | Perforation Treatment Performed - Fractured |
1994-06-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-06-11 | Perforation Treatment Performed - Jet Perforation |
1994-06-11 | Plug Back Performed |
1994-06-11 | Well Fluid changed to Gas |
1994-06-11 | Well Log Performed |
1994-06-11 | Well Mode changed to Abandoned |
1994-06-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-06-12 | Plug Back Performed |
1994-08-18 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1973-10-11 | Perforation | 1217.40 | 1218.00 | 3 |
1974-07-05 | Perforation | 1208.80 | 1209.80 | 3 |
1974-07-21 | Perforation | 1205.20 | 1206.40 | 3 |
1982-09-20 | Perforation | 1204.00 | 1206.00 | 13 |
1982-09-22 | Acid Treatment | 1204.00 | 1206.40 | 0 |
1982-09-29 | Chemical Squeeze | 1204.00 | 1206.40 | 0 |
1984-02-06 | Acid Treatment | 1217.40 | 1218.00 | 0 |
1989-05-18 | Perforation | 1202.10 | 1210.60 | 13 |
1993-05-29 | Fracture | 1202.10 | 1210.60 | 0 |
1994-06-11 | Packing Device Capped w/Cement | 1206.60 | 1214.60 | 0 |
1994-06-11 | Packing Device Capped w/Cement | 1176.00 | 1184.00 | 0 |
1973-10-16 | Perforation | 1231.40 | 1232.60 | 3 |
1994-06-11 | Perforation | 942.40 | 944.00 | 13 |
1994-06-12 | Packing Device Capped w/Cement | 925.00 | 933.00 | 0 |
1973-10-17 | Cement Squeeze | 1231.40 | 1232.60 | 0 |
1973-10-19 | Selective Jet Perforations | 1188.10 | 1188.10 | 10 |
1973-10-19 | Selective Jet Perforations | 1190.20 | 1190.20 | 0 |
1973-10-19 | Perforation | 1191.80 | 1193.00 | 3 |
1973-10-23 | Acid Treatment | 1188.10 | 1193.00 | 0 |
1973-10-23 | Cement Squeeze | 1188.10 | 1193.00 | 0 |
1973-11-03 | Acid Treatment | 1217.40 | 1218.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1981 | 5 | 0.0 | 0.0 | 0.0 |
1982 | 1877 | 0.0 | 0.0 | 0.0 |
1983 | 2290 | 0.0 | 0.0 | 0.0 |
1984 | 2292 | 0.0 | 0.0 | 0.0 |
1985 | 2418 | 0.0 | 0.0 | 0.0 |
1988 | 1212 | 0.0 | 0.0 | 0.0 |
1989 | 7596 | 0.0 | 0.0 | 0.0 |
1990 | 8331 | 0.0 | 0.0 | 0.0 |
1991 | 7030 | 0.0 | 0.0 | 0.0 |
1992 | 5102 | 0.0 | 0.0 | 0.0 |
1993 | 3973 | 0.0 | 0.0 | 0.0 |
For data sources see[5]