X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144200706000

Well Details

Well ID: 0144200706000
Loading map...
Location: 00/06-07-014-20W4/0
Location Alias: 00/06-07-14-20 W4M
Location Alias 2: 00/06-07-014-20 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 20
Section: 07
County/Municipality: Vulcan County
Well Name: SLE RETLAW 6-7-14-20
Operator Name: SanLing Energy Ltd.
License Number: 0161280
License Date: 1993-09-30
License Status: Suspension
Spud Date: 1993-10-02
Final Drill Date: 1993-10-07
Well Total Depth: 1280.00 m
Surface Hole Latitude: 50.156239
Surface Hole Longitude: -112.728463

For data sources see[1][2]

Well History

Date Event
1993-09-30 Obtained License
1993-10-03 Water Flow Occurred
1993-10-04 Surface Casing Operation Performed
1993-10-07 Finished Drilling
1993-10-07 Well Log Performed
1993-10-07 Well Mode changed to Drilled and Cased
1993-10-08 Well Log Performed
1993-10-09 Production Casing Operation Performed
1993-10-09 Rig Released
1993-10-16 Well Log Performed
1993-10-17 Perforation Treatment Performed - Jet Perforation
1993-10-17 Well Log Performed
1993-12-15 Well Began Production
1993-12-15 Well Fluid changed to Gas
1993-12-15 Well Mode changed to Flowing
2000-07-15 Perforation Treatment Performed - Jet Perforation
2000-07-15 Well Log Performed
2000-07-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-17 Perforation Treatment Performed - Jet Perforation
2000-07-17 Plug Back Performed
2000-07-17 Well Log Performed
2000-07-19 Perforation Treatment Performed - Jet Perforation
2000-07-19 Well Log Performed
2012-01-29 Well Fluid changed to Gas
2012-01-29 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-10-17 Perforation 1252.50 1254.00 13
2000-07-15 Perforation 883.00 886.50 13
2000-07-17 Packing Device Capped w/Cement 867.00 875.00 0
2000-07-17 Perforation 404.00 407.00 13
2000-07-19 Perforation 407.00 413.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 463 0.0 0.0 0.0
1994 7950 0.0 0.0 0.0
1995 2381 0.0 0.0 0.0
1996 1105 0.0 0.0 0.0
1997 4588 0.0 0.0 0.0
1998 2952 0.0 0.0 0.0
1999 8514 0.0 0.0 0.0
2000 7712 0.0 0.0 0.0
2001 7800 0.0 0.0 0.0
2002 7304 0.0 0.0 0.0
2003 8534 0.0 0.0 0.0
2004 8410 0.0 0.0 0.0
2005 8752 0.0 0.0 0.0
2006 8747 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8015 0.0 0.0 0.0
2011 7295 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-10-03 Water Flow 250.00 250.00
2000-07-15 No Incident Encountered 0.00 0.00
2000-07-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References