X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144183514000

Well Details

Well ID: 0144183514000
Loading map...
Location: 00/14-35-014-18W4/0
Location Alias: 00/14-35-14-18 W4M
Location Alias 2: 00/14-35-014-18 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 18
Section: 35
County/Municipality: Municipal District of Taber
Well Name: CRESCENT POINT LBOW 14-35-14-18
Operator Name: Crescent Point Energy Corp.
License Number: 0099288
License Date: 1982-11-26
License Status: RecCertified
Spud Date: 1982-12-27
Final Drill Date: 1983-01-02
Well Total Depth: 1113.00 m
Surface Hole Latitude: 50.222074
Surface Hole Longitude: -112.363859

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-11-26 Obtained License
1983-01-02 Finished Drilling
1983-01-04 Drill Stem Test Performed
1983-01-06 Production Casing Operation Performed
1983-01-06 Well Mode changed to Drilled and Cased
1983-06-08 Perforation Treatment Performed - Jet Perforation
1983-06-09 Perforation Treatment Performed - Jet Perforation
1996-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-20 Perforation Treatment Performed - Jet Perforation
1996-06-20 Well Log Performed
1996-06-20 Well Mode changed to Abandoned Zone
2000-09-01 Perforation Treatment Performed - Cement Squeeze
2000-09-05 Perforation Treatment Performed - Jet Perforation
2000-09-05 Well Log Performed
2002-11-06 Well Log Performed
2002-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-07 Plug Back Performed
2002-11-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-06-08 Perforation 891.00 893.00 13
2000-09-05 Perforation 853.00 859.00 13
2002-11-07 Packing Device Capped w/Cement 837.00 845.00 0
2002-11-07 Packing Device Capped w/Cement 259.80 267.80 0
1983-06-09 Perforation 881.00 885.00 13
1983-06-09 Perforation 891.00 893.00 13
1996-06-20 Packing Device Capped w/Cement 862.00 870.00 0
1996-06-20 Perforation 276.50 278.00 13
2000-09-01 Cement Squeeze 276.50 278.00 13
2000-09-05 Perforation 880.00 886.00 13
2000-09-05 Perforation 881.00 885.00 13
2000-09-05 Perforation 866.00 872.00 13

For data sources see[4]



References