X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144172916020

Well Details

Well ID: 0144172916020
Loading map...
Location: 02/16-29-014-17W4/0
Location Alias: 02/16-29-14-17 W4M
Location Alias 2: 02/16-29-014-17 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 17
Section: 29
County/Municipality: Municipal District of Taber
Well Name: SLE ENCHANT 16-29-14-17
Operator Name: SanLing Energy Ltd.
License Number: 0115934
License Date: 1985-07-08
License Status: Suspension
Spud Date: 1985-07-14
Final Drill Date: 1985-07-19
Well Total Depth: 1103.00 m
Surface Hole Latitude: 50.207521
Surface Hole Longitude: -112.283955

For data sources see[1][2]

Well History

Date Event
1985-07-08 Obtained License
1985-07-15 Surface Casing Operation Performed
1985-07-19 Finished Drilling
1985-07-19 Well Log Performed
1985-07-20 Drill Stem Test Performed
1985-07-21 Drill Stem Test Performed
1985-07-22 Production Casing Operation Performed
1985-07-22 Rig Released
1985-07-23 Well Mode changed to Drilled and Cased
1988-03-02 Well Log Performed
1988-03-03 Perforation Treatment Performed - Jet Perforation
1988-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-06-21 Perforation Treatment Performed - Fractured
1988-06-22 Perforation Treatment Performed - Jet Perforation
1988-06-22 Well Log Performed
1988-06-25 Well Mode changed to Drilled and Cased
1995-10-01 Well Began Production
1995-10-01 Well Fluid changed to Crude Oil
1995-10-01 Well Mode changed to Flowing
1999-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-01-08 Plug Back Performed
1999-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-01-09 Perforation Treatment Performed - Jet Perforation
1999-01-09 Plug Back Performed
1999-01-09 Well Fluid changed to Crude Oil
1999-01-09 Well Mode changed to Abandoned Zone
1999-01-10 Perforation Treatment Performed - Jet Perforation
2001-09-18 Well Fluid changed to Crude Oil
2001-09-18 Well Mode changed to Pumping
2008-11-01 Well Fluid changed to Crude Oil
2008-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-03-03 Perforation 1038.60 1039.60 13
1988-06-20 Acid Treatment 1038.60 1039.60 0
1988-06-21 Fracture 1038.60 1039.60 0
1988-06-22 Perforation 1036.00 1038.30 13
1988-06-22 Perforation 1063.50 1070.00 13
1999-01-08 Packing Device Capped w/Cement 1044.20 1052.20 0
1999-01-09 Packing Device Capped w/Cement 1022.00 1030.00 0
1999-01-09 Perforation 868.00 870.00 13
1999-01-10 Perforation 786.50 789.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 176 0.0 0.0 0.0
1996 2315 0.0 0.0 0.0
1997 4315 0.0 0.0 0.0
1998 24 0.0 0.0 0.0

For data sources see[5]

References