X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144142510000

Well Details

Well ID: 0144142510000
Loading map...
Location: 00/10-25-014-14W4/0
Location Alias: 00/10-25-14-14 W4M
Location Alias 2: 00/10-25-014-14 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 14
Section: 25
County/Municipality: County of Newell
Well Name: CNRL ALDSON 10-25-14-14
Operator Name: Canadian Natural Resources Limited
License Number: 0022897
License Date: 1962-08-21
License Status: Abandoned
Spud Date: 1962-08-23
Final Drill Date: 1962-08-28
Well Total Depth: 996.70 m
Surface Hole Latitude: 50.202280
Surface Hole Longitude: -111.787280

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-08-21 Obtained License
1962-08-26 Drill Stem Test Performed
1962-08-28 Finished Drilling
1962-08-28 Well Mode changed to Drilled and Cased
1962-08-29 Drill Stem Test Performed
1962-08-30 Production Casing Operation Performed
1962-09-04 Perforation Treatment Performed - Jet Perforation
1962-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-09-05 Perforation Treatment Performed - Fractured
1962-09-22 Well Began Production
1962-09-22 Well Fluid changed to Crude Oil
1962-09-22 Well Mode changed to Flowing
1962-10-13 Perforation Treatment Performed - Jet Perforation
1962-10-13 Perforation Treatment Performed - Remedial Casing
1962-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-10-20 Perforation Treatment Performed - Condensate Squeeze
1983-11-01 Well Fluid changed to Crude Oil
1983-11-01 Well Mode changed to Pumping
1996-10-22 Well Fluid changed to Crude Oil
1996-10-22 Well Mode changed to Suspended
1998-12-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-12-08 Plug Back Performed
1998-12-08 Well Fluid changed to Crude Oil
1998-12-08 Well Mode changed to Abandoned Zone
1998-12-09 Perforation Treatment Performed - Jet Perforation
2001-09-21 Perforation Treatment Performed - Jet Perforation
2002-05-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-05-22 Plug Back Performed
2002-05-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-09-04 Perforation 957.70 961.00 13
2001-09-21 Perforation 596.40 597.40 17
2002-05-22 Packing Device Capped w/Cement 585.00 593.00 0
2002-05-22 Packing Device Capped w/Cement 688.00 696.00 0
1962-09-05 Acid Treatment 957.70 961.00 0
1962-09-05 Fracture 957.70 961.00 0
1962-10-13 Perforation 278.00 278.10 4
1962-10-13 Remedial Casing Cementing 278.00 278.10 0
1962-10-18 Acid Treatment 957.70 961.00 0
1962-10-20 Condensate Squeeze 957.70 961.00 0
1998-12-08 Packing Device Capped w/Cement 934.50 942.50 0
1998-12-09 Perforation 740.50 742.50 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 696 0.0 0.0 0.0
1969 3741 0.0 0.0 0.0
1970 3986 0.0 0.0 0.0
1971 3882 0.0 0.0 0.0
1972 3895 0.0 0.0 0.0
1973 7262 0.0 0.0 0.0
1974 923 0.0 0.0 0.0
1975 6695 0.0 0.0 0.0
1976 7612 0.0 0.0 0.0
1977 8141 0.0 0.0 0.0
1978 6599 0.0 0.0 0.0
1979 7193 0.0 0.0 0.0
1980 8687 0.0 0.0 0.0
1981 8759 0.0 0.0 0.0
1982 8639 0.0 0.0 0.0
1983 8711 0.0 0.0 0.0
1984 8740 0.0 0.0 0.0
1985 8505 0.0 0.0 0.0
1986 8505 0.0 0.0 0.0
1987 8551 0.0 0.0 0.0
1988 8679 0.0 0.0 0.0
1989 8445 0.0 0.0 0.0
1990 8471 0.0 0.0 0.0
1991 8375 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8183 0.0 0.0 0.0
1994 4762 0.0 0.0 0.0
1995 5951 0.0 0.0 0.0
1996 6641 0.0 0.0 0.0

For data sources see[5]

References